What are the two elevated areas in Hartford where fire suppression activities experience low water pressure and flow rates?
Prospect Hill and Avery Heights.
MDC has installed a system that allows department apparatus to pump water into a ____ ________ hydrant to supplement the existing water main pressure and flow rates during fire suppression operations.
dry check-valved.
All hydrants in the elevated areas served by the increased pressure from this green bonnet hydrant system have the hydrant bonnet painted what color?
Green.
At the base level of each elevated area, MDC has installed a set of two hydrants positioned within ____ feet of each other at two separate locations.
50
The yellow bonnet hydrant is a standard ____ ______ hydrant on a water main providing and except a minimum flow rate of ____ GPM.
Dry Barrel, 1000.
The green bonnet hydrant has a check-valve to allows water to be pumped into the hydrant and the interconnected water main, resulting in what?
Increasing water flow and pressure.
At each hydrant location is a storage cabinet secured with a cutaway lock containing what?
A 25ft 5in supply line with the couplings painted green to indicate use with the green bonnet hydrant, A mallet and a spare cutaway lock.
The first due engine shall proceed to the incident address. If the address is within ____ ft of the yellow bonnet hydrant, the company will utilize the ____ bonnet hydrant and lay a supply line to the incident address.
500, yellow.
The first due engine shall proceed to the incident address. If the address is further than ____ ft of the yellow bonnet hydrant, the company will utilize the ____ bonnet hydrant and lay a supply line to the incident address.
500, Green.
Be aware the flow rate and water pressure on hoselines and appliances will not be optimized until the ____ _____ hydrant system is operational.
Green bonnet.
The _____ ____ to initiate the green bonnet hydrant system procedure shall be a primary consideration in implementing the IAP and associated tactics
Set-up time.
Where should the second and third due engine proceed to once they arrive on scene?
To their designated Green bonnet hydrant system locations.
What must the Engine companies do in order to access the contents of the green bonnet hydrant system storage cabinet?
Cut the lock off the storage cabinet.
Once the second and third due engines open the storage cabinet, they should attach one coupling of the ____ ft section of 5in supply line to the __ diameter discharge of the apparatus and the other coupling to the ____ on the green bonnet hydrant.
25, large, steamer
Once the second and third due engine hooks up the green bonnet hydrant to the discharge, what hydrant are they utilizing to connect to the intake on the pump?
The yellow bonnet hydrant
Once all the hydrants are hooked up and opened, what mode and PSI should the driver operate at?
Volume mode at no more than 110-115psi
What will happen if you over pump the hydrant system?
It will activate the internal relief valve and decrease the flow rate and water pressure.
Who has to get notified when the green bonnet hydrant system has been charged and is in operation?
IC
Residual pressure may fall as low as ___ psi in order to generate the necessary water pressure and flow rated for fire suppression when employing the green bonnet hydrant system.
5
At the conclusion of the incident, return all _____ to the green bonnet hydrant system storage cabinet and re-secure it with the enclosed _____ lock.
Materials, Cutaway
After the incident, a department email should be sent to who, requesting the spare cutaway lock to be replaced?
FACT division
Box number _____ at 705 New Britain Ave, Cottages requires the following assignment;
E9, E___, E10, T1, L2, L__, D1
4466, E15, L5
Box number 4551 at 705 New Britain Ave, Avery Heights Convalescent Hospital requires the following assignment;
E__, E15, E10, T1, L2, L__, D1
E9, L5
Box number _____ at 705 New Britain Ave, Avery Heights “The Heights Building” requires the following assignment;
E9, E5, E10, T1, L___, L___, D1
4553, L2, L6
Box number _____ at 705 New Britain Ave, Avery Heights Nursing Home requires the following assignment;
E9, E15, E10, D1, L2, L__, D1
4556, L6
Box number _____ at 705 New Britain Ave, Avery Heights Noble Building requires the following assignment;
E9, E15, E10, T1, L2, L__, D1
4557, L6
Box number 4558 at 705 New Britain Ave, Avery Heights Nursing New Addition requires the following assignment;
E9, E15, E10, T1, L__, L___, D1
L2, L6
What green bonnet hydrant does the second due engine take?
The green bonnet hydrant located on the west side of newington ave opposite Avery heights entrance. (North corner of newington ave and Waterford st)
What green bonnet hydrant does the third due engine take?
The green bonnet hydrant located in front of 80 Haddam St opposite Storrs St.