Charter Oak Bridge Flashcards

1
Q

Does the bridge have a dry or wet standpipe system?

A

Dry.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The ___ inch diameter pipe runs ____ ft down the median divider.

A

6 inch, 3200 ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where is the standpipe system connection located?

A

The connection is located under the north bound roadway at the first bridge support pier east of Reserve Road on the river side of the pier between Reserve rd and the dike.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The standpipe system is supplied with water from a hydrant to a standard ____ ______ ______ connection

A

Fire department Siamese

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How’s far apart are the standpipe discharges on the center median?

A

Approximately 300ft apart.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Each standpipe discharge has two ___ inch discharge with ______ control valves.

A

2 1/2 inch, non-indicating control valves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The standpipe discharges are easily recognized and are easily accessible due to a wide _____ ____ _____ down the center of the bridge.

A

Non-travel lane shoulder.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Where is the water supply control valve located?

A

A water supply control valve is located on the center median directly above the Hartford side fire department connection.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What position is the water supply control valve locked?

A

Locked open.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Where is the air bleed-off valve located?

A

An air bleed-off valve is located on the standpipe at its highest point of elevation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When will the standpipe system be utilized?

A

Use of the standpipe system will not be automatic. Responding units will call for the standpipe operation whenever necessary.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What main st is Charter Oak Bridge close to?

A

Airport Rd

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Why are special considerations required when the use of the standpipe system is needed?

A

Special considerations are required when the use of the standpipe system is needed due to the extreme length of piping, pumping, and mutual aid response.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

All incidents occurring on the bridge shall be a ____ ___ response with the _____ _____ ___ department.

A

Mutual aide response, East Hartford Fire Department.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the alarm box number for the Charter Oak bridge?

A

3714

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the responding companies for the charter Oak Bridge?

A

Engine 10, 1, 15, 8,
Tac 1,
Ladder 6, 2,
District 1.

17
Q

All incident occurring on the entire RTE 5 and 15 southbound lanes over the bridge to exit 87 Brainerd Rd shall be covered by who?

A

East Hartford Fire.

18
Q

All incidents occurring on the entire RTE 5 and 15 north bound lanes over the bridge from the Brainerd Rd entrance shall be covered by who?

A

Hartford Fire Department.

19
Q

Where is the boundary for the incident command responsibility and incident reports?

A

Boundary for the incident command responsibility in incident report shall be the middle of the Connecticut River.

20
Q

Where does the first due engine respond?

A

The first due engine shell respond to the incident scene on the bridge at the north bound lane from Brainard Road.

21
Q

Where must the 2nd due engine respond?

A

The 2nd due engine shall respond to the stand pipe connection point.

22
Q

Where is the nearest hydrant to the standpipe connection point?

A

The nearest hydrant is 500 feet south on Reserve Road.

23
Q

What are the responsibilities of the second due engine?

A

The second due engine must locate at the hydrant and stretch line to the stand pipe connection, pumping into the standpipe connection upon orders of the incident commander.

24
Q

What PIS shall the pump operator pump into the system at?

A

150 PSI.

25
Q

Fire Apparatus on bridge shall ___ ___ ____ first to prevent ______.

A

Shut down pump first to prevent cavitation.

26
Q

Do not delay ____ procedure awaiting communication with east Hartford. As soon as direct communication is available, relay pumping operating pressures may be _____.

A

Pumping , adjusted.

27
Q

Where does the 3rd due engine respond and what are their responsibilities?

A

The 3rd due engine shall respond to the incident along with the 1st due engine and await orders from the incident commander.

28
Q

Where should the first due ladder respond and what are their responsibilities?

A

The first due ladder should respond to the incident scene and await orders from the incident commander.

29
Q

Where does the 2nd due ladder locate?

A

The 2nd due ladder shall stage prior to entering the highway and await orders from the incident commander.

30
Q

Where does the 4th due engine respond and what are their responsibilities?

A

The 4th due engine shall respond to the stand pipe connection point to assist the 2nd due engine and provide a backup apparatus.

31
Q

Each time the standpipe system is charger who has to be notified and why?

A

Each time the standpipe system is charged the state of Connecticut DOT shall be notified to drain the system.

32
Q

The Hartford side storm drain empties into a low area ___ of _______ rd under the charger pal bridge.

A

West, reserve

33
Q

The bridge center and east Hartford side storm drains are direct to the ____ or wetlands. Hartford side ramps - direct to the _____.

A

River, ground