Gojet CRJ700 Electrics Flashcards
What does the AC ESS XFER switchlight do when selected
Transfers the AC Essential Bus to AC BUS 2
How can the DC Service bus be powered?
From DC BUS 2 during normal DC operation, or from the APU BAT DIR BUS through use of the DC service switch.
If ESS TRU 1 & 2 fail, how would the DC Essential Bus remain powered?
The automatic closure of the ESS TIE and the CROSS TIE will power both the DC BATT BUS and the DC ESS BUS in this situation
What is the purpose of the ESS TRU 2 Tie Contactor?
After failure of both AC BUS 2 and ESS TRU 1, allows the AC ESS BUS to power ESS TRU 2. It will also do this if on ADG power and ESS TRU 1 fails.
What does the ADG power?
ADG Bus, AC ESS BUS, slats, flaps, ACMP 3B pump and Stab Trim Channel 2
What items are powered by the DC EMER BUS?
Engine and APU fire extinguishers and hydraulic and fuel shutoff valves.
What are the Ampere/Hour and voltage ratings of the main and APU batteries?
Main 17 Amps/24 volts
APU 43 Amps/24 volts
How many TRUs does the aircraft have and what are they rated at?
4 TRUs/120 amps
What is the normal power source for the AC ESS BUS?
AC BUS 1.
What is the priority of power source for each AC bus?
Onside generator–APU generator—opposite generator—external power
What part of the IDG keeps the generator turning at a constant speed of 12,000 rpm?
Constant Speed Drive (CSD).
What is the minimum airspeed required for proper operation of the ADG generator?
135 KIAS
The ADG supplies power to ______________.
AC Essential bus, ADG bus and 3B hydraulic pump.
What must you do to return the AC ESS BUS and ACMP 3B pump to normal aircraft power once the ADG deploys?
Insure ADG handle is stowed, then press the PWR XFER OVERRIDE button on the ADG control panel.
What will happen to the AC ESS BUS and 3B pump after XFER Override when the aircraft generator power fails again?
They will revert back to being powered from the ADG