Friction Loss Worksheet Flashcards
Find the Friction loss of 600’ of 2 1/2” hose flowing 250GPM.
90lbs
Find the fiction loss of 700’ of 2 1/2” hose flowing 200GPM.
70lbs
Find the friction loss of 1000’ of 2 1/2” hose flowing 300GPM.
210lbs
Find the friction loss of 400’ of 1 1/2 hose flowing 100GPM.
100 psi
Find the friction loss of 300’ of 1” hose flowing 30 GPM.
45 psi
Find the friction loss of 400’ of 2 1/2” hose connected to 200’ of 1 1/2” hose connected to 300’ of 1” hose flowing 30 GPM.
84.72lbs
Find the friction loss of 600’ of 4” hose flowing 1000 GPM.
120lbs
Find the friction loss of 500’ of 4” hose flowing 800 GPM.
64lbs
Practice Problem #1
Find the pump discharge pressure (PDP) of 700’ of 2 1/2” hose flowing at 250 gpm.
180
Practice Problem #2
Find the PDP of 400’ of 1 1/2” hose flowing at 125 gpm.
PDP 215
Practice Problem #3
Find the PDP of 300’ of 1” hose flowing at 30 gpm.
PDP 145
Practice Problem #4
Find the friction loss of 300’ of 2 1/2” hose connected to 300’ of 1 1/2” hose connected to 500’ of 1” hose flowing at 30 gpm.
PDP 181
Practice Problem #5
Find the PDP of 500’ of 4” hose flowing at 1,000 gpm to a portable deluge.
PDP 225
Practice Problem #6
Find the PDP of a turret operation flowing at 1,000 gpm.
PDP 105
Practice Problem #7
Find the PDP of the following Rapid Attack Monitor (RAM) Operation.
PDP 120
Practice Problem #8
Find the PDP of the following RAM Operation.
PDP 140
Practice Problem #9
Find the PDP of 300’ of 2 1/2” hose flowing at 200 gpm from a fog nozzle that is 60’ above the fire pump.
PDP 110
Practice Problem #10
Find the PDP of 200’ of 1 1/2” hose flowing at 100 gpm from a fog nozzle that is 70’ below the fire pump.
PDP 110
Practice Problem #11
Find the PDP of 300’ of 1 1/2” hose flowing at 185 gpm from a barrel tip nozzle that is 100’ above the fire pump.
PDP 340
Practice Problem #12
Find the PDP of the following wyed operation.
300 2 1/2” wye 150 1 1/2” 125 gpm 75 NP
250 1 1/2” 125 gpm 75 NP
PDP 207.5
Practice Problem #13
Find the PDP of the following wyed operation.
600 1 1/2” wye 300 1” 30gpm 100psi NP
600 1” 30gpm 100psi NP
PDP 250
Practice Problem #14
Find the PDP of the following wyed operation.
400 2 1/2” wye 200 1 1/2” 125 gpm 75NP
400 1” 20 gpm 100 NP
PDP 180
Practice Problem #15
Find the PDP of the following Siamese deluge operation.
400’ 2 1/2”
350’ 2 1/2” } Deluge 750 gpm barrel tip
450’ 2 1/2”
PDP 165