Flight Plans Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

What are the two types of flight plans?

A

IFR n VFR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When is a flight plan required?

A

1) a flight provided with ATC service
2) IFR Flights in Advisory Airspace
3) Flights within a Area/route providing a FIS/ Alerting and search and rescue service
4) Flights in an area facilitating coordination with appropriate military or ATSUs in adjacent states to avoid being intercepted
5) Flights that cross international Borders
6) Flights at night leaving the vicinity of an aerodrome

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the 3 categories of flight plans?

A

Full
Repetitive flight plan (RPL)
Abbreviated FPL: phone/RTF

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Is it possible to mix RPL and FPL?

A

No cannot mix

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many days before submission minimum for a RPL?

A

14 days before first flight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many days for a revised submission minimum for RPL?

A

7 WORKING days before first flight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Suspension of RPL flights not accepted less than 3 days.
True or False?
What must be done if missed?

A

True.

Individual daily cancellation messages required.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The destination aerodrome will be advised of abbreviated FPL flight if the information covers the whole route of the flight. True or False?

A

True.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When can a Pilot file a FPL?

A

For any flight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When must a flight plane be submitted?

A

60 minutes before start/taxi clearance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How many hours in advance must a FPL (before EOBT) for North Atlantic Flights (subject to Air Traffic Flow Management Measures)

A

3 hours before EOBT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

For an airborne flight plan what is the warning time required to enter controlled airspace?

A

At least 10 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Who is responsible for DEP messages?

A

ATSU or responsible person?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When is overdue action taken?

A

Within 30 minutes of the notified ETA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When must a DEP message be sent?

A

For IFR FPL operating outside the IFPS Zone

VFR FPLs

IFR FPLs operating outside CAS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Who is responsible for the distribution of IFR/General Air Traffic (GAT) Flight Information?

A

Eurocontrol Air Traffic Flow Control Management (AFTCM) initiative

17
Q

Flights within the IFPS Zone addressed to 2

EUCHZMFP
EUCBZMFP

True or False

A

True

18
Q

How far in advance can you file a

FPL?

A

120 hours

19
Q

If not commencing EOBT within 24 hours must be dated (EOBD)

True or False?

A

True

20
Q

Who is responsible for filing a FPL?

A

Aircraft Operators

21
Q

What 5 fields can’t be changed with a CHG message?

A

1) Aircraft Callsign
2) Departure Aerodrome
3) Destination Aerodrome
4) EOBT
5) EOBD

22
Q

When a FPL has been cancelled you must wait 5 minutes till sending a new one. True or False?

A

True

23
Q

What is a SRM?

A

Slot revision message

24
Q

Are VFR flight plans covered by IFPS?

A

No. Assessed to FIR and appropriate Aerodromes

25
Q

If ATSU at departure/destination aerodrome they shall inform the other of POB and pass details in field 19 of FPl.

True or False

A

True.

26
Q

What type of flight plan shall a SVFR FLIGHT FILE AS?

A

IFR

27
Q

Aircraft needing SVFR Clearance shall be states in field 15 designating the points at which the pilot intends to enter or Leave CTR. And the SVFR routing within the CTR.

True or False?

A

True

28
Q

what details are in section 19 if the flight plan?

A
Endurance 
POB 
Safety equipment 
Radio types 
Dingies and jackets 
PIC