Evolution 25 LSR With /without Parapet Flashcards
Member 1 (lowering member ) should place the carrying case how
Facing point of decent place the carrying case on the roof with the back of case facing point of decent
Member 1 the lowering member should Don the life belt with the hook
On the right side
After inverting the bag the lowering member (#1) the ember will place the case clear of the operation and then grasp the snap hook from the top and place it
On the roof to the left adjacent to the coil
As member one pays out rope from top of coil to the substantial object the Member being lowered(#2). Will
Place one foot on the snap hook
Member 1 the lowering member tie a
Clove hitch and binder on taught part of rope around substantial objec
After tying substantial object knot member 1 (lowering member ) will return to rope and grab the hook that was maintained. By member 2 he will attach it to
The bottom part of the “O” ring of the life belt
SNAP PORTION OF HOOK SHOULD FACE DOWN
After pulling the legs loops up and hold the knot snugly against your stomach member # 2 ( member being lowered ) will assist member #1 In Tying the slippery hitch . Member number two will face number 1 and hold anti-chaffing device in which hand ?
Right hand
After tying the the slippery hitch member 1 will walk toward the point of decent and remove the slack from the rope . At this point member # 1 will face number 2 and grasp the rope leading to anti chaffing device with ______ hand and bring his hand back along rope to _____
- Right
2. Right hip
After bringing rope back to right hip member number one will use this as a mark . He will bring the rope forward and lay _____ on the rope with _____ facing
Solid part of hook (life belt )
Gate to left
The following procedures are in order for attaching the rope to member # 1 hook(lowering member
All of the following are performed by member #1
After laying solid part of hook on rope then:
1. Pull gate down with left hand and turn gate fully with left hand with twisting direction to the left this will unlock gate
2. With left hand push gate over to the solid side of hook ..as gate reaches end of motion grab hook , rope and gate together with right hand
3. Using left hand make four turns under and over (balls to belly)the life belt hook with the rope leading to member 2
4. Release gate (gate will close automatically)
5. Push the gate lock into notched potion of gate . This completes the locking system
After the rope is lock into member #1 hook , the lowering member (#1) will hold the life belt hoo with his _____hand. He will hold the hook with his left hand _____. Then he will move his right hand along the rope to his _____
- Left hand
2 palm down - Right buttock
When member one is ready member 2 will begin to straddle parapet . He will hold the anti-chaffing device in ______hand and turn to the ______ Side and straddle the parapet _____ leg to the outside
- Left hand
- Right
- Right leg
When straddling the parapet member #2 will allow enough slack in the rope to place the anti-chaffing device flat on the parapet with approximately _____inches of device over the edge
5 inches
When ember number rolls of the parapet into a vertical position his feet approximately ______apart
12 inches
Toes up
Differences btwn building with a parapet or building without parapet
Member #2
Hold anti-chaffing in left hand and walk to point of descent
Sit with legs over edge the rope and anti-chaffing device will be to left
With anti-chaffing device in place member 2 will place left hand btwn the anti-chaffing device and left leg using hand to pivot roll body to left into push-up position and make sure rope is in channel
Lower body into vertical position