Erector's Manual Standards and Guidelines for the Erection of Precast Concrete Products Flashcards
Items that relate to transportation and unloading
Erector’s manual standards and guidelines for the erection of precast concrete products
PG 11
Rotation of panel performed over truck bed
Developing your stormwater pollution prevention plan
PG 16
Dunnage shall not be continuous over more than one stack
Developing your stormwater pollution prevention plan
PG 17
Wall panel bracing must be maintained until permanent connections are accomplished
Developing your stormwater pollution prevention plan
PG 31
Concrete panels help with more rapid construction
Developing your stormwater pollution prevention plan
PG 32
Need greater than 1” joist dimension when dry packing grout
Developing your stormwater pollution prevention plan
PG 41
Minimum temperature to grout panels is 40 degrees
Developing your stormwater pollution prevention plan
PG 43
Fig 2.5.2.3(A) - shows precast column corbels
Developing your stormwater pollution prevention plan
PG 47
Temporary shoring must stay in place until stability achieved
Developing your stormwater pollution prevention plan
PG 48
Hollow core slab joint greater than 1/8” shall be taped
Developing your stormwater pollution prevention plan
PG 49
Precast concrete floor jacking post may be removed when the grout has hardened
Developing your stormwater pollution prevention plan
PG 51