Electrical System (CSG) Flashcards
Electrical System
What are the electrical power generating sources on the U-28 Trainer?
Battery, Gen 1, Gen 2, EPS Battery
AOH Vol 2, Section 15
Electrical System
During flight, the BUS TIE is normally _______ (closed/open) and the GEN 2 TIE is normally _______ (closed/open)?
Closed, Open
AOH Vol 2, Section 15
Electrical System
What buses does GEN 1 normally power?
Gen 1, AV 1 and 2, Battery, non-essential, power line
AOH Vol 2, Section 15
Electrical System
What does the MASTER POWER switch do?
Enables all electrical power (except EPS batt) to be switched OFF
AOH Vol 2, Section 15
Electrical System
What bus powers the STBY BUS when power is first applied (Engine not running)?
Battery Direct
AOH Vol 2, Section 15
Electrical System
What items are on the Battery DIRECT bus?
Clock, 50% dome light, cargo door motor, Baggage comp light, Standby Bus
AOH Vol 2, Section 15
Electrical System
The Emergency Power System (EPS) battery provides power to the _________________ for approximately _____ minutes after loss of all other electrical power?
Pilot and Copilot standby instruments and associated lighting, 30
AOH Vol 2, Section 15
Electrical System
When testing the EPS battery, hold the test switch for _____ seconds. What status does the green light indicate?
3 seconds, EPS is properly charged (80% of rated capacity)
AOH Vol 2, Section 15
Electrical System
Minimum main battery voltage for engine start is _______ volts.
24
AOH Vol 1, Chapter 2
Electrical System
When the BATTERY CAWS illuminates, what condition(s) exist?
Amp draw more than 60, or overvoltage
AOH Vol 1, Chapter 3
Electrical System
In the case of an engine failure or double generator failure the 26V Lithium Ion battery will supply essential electrical systems for at least ____ minutes if the load is reduced below ____ amps.
30, 80
Engineer Assessment from test data
Electrical System
With the STBY switch in the OFF position, what bus provides power to the STBY
bus?
AV 1
AOH Vol 2, Section 15
Electrical System
IAW AOH Vol 1, Chapter 2 Normal Procedures, when external power (GPU) is connected, VDC should be between _____ and _____ volts. The external power control unit on the aircraft will disconnect the GPU if the output voltage is less than ______ VDC or greater than ______ VDC.
27, 29.5, 25, 29.5
AOH Vol 2, Section 15
Electrical System
Generator #1 is rated at _______ AMPS and can extend to _____ AMPS for 2
minutes.
400, 470
AOH Vol 1, Chapter 5
Electrical System
Generator #2 is rated at _______ AMPS with a max desired load of ______ AMPS
115, 90
AOH Vol 1, Chapters 2 and 5