Electrical Flashcards
What is the normal electrical supply for AC EMER BUS?
AC ESS BUS
How is an IDG disconnect confirmed?
The IDG FAULT light extinguishes and Gen FAULT light
illuminates
The IDG is disconnected while airborne, when can the IDG be reconnected?
Only by a mechanic when on the ground
In the A300 electrical system, what are the 4 AC buses?
AC EMER, AC ESS, and AC #1 & #2
What is the normal electrical supply for AC ESS BUS?
AC bus #1
What happens when both AC OVRD Supply switches are
selected ON?
AC EMER, AC ESS, and DC ESS are the only busses supplied
If the AC ESS BUS is lost, how may the AC EMER BUS be
supplied?
DC ESS BUS via automatic activation of the Emergency Static
Inverter
In the A300 electrical system, what are the three DC Buses?
HOT Battery Bus, DC ESS, and DC NORM
Which switch will manually connect the batteries to the DC
ESS bus?
BAT OVRD
What is lost with the BAT OVRD switch selected ON?
STBY GEN operation, BAT overheat protection, BAT charging
Avionics smoke drill is equivalent to standby generator in that
they both have three buses that are de-energized. What three
busses are they?
AC Bus 1 & 2 and DC Norma
How does selecting the LAND RECOVERY switch ON affect the
STBY GEN operation?
It disconnects the DC ESS BUS from the STBY GEN and uses the
batteries to power the DC ESS BUS
Which system is not recovered with the LAND RECOVERY
switch selected ON?
Kruger Flaps
Selecting the MECH CALL HORN CTL switch (on the overhead
panel) to ON does what?
It deactivates the nose gear mechanic call horn for battery
discharge on an unpowered aircraft
If OVRD SUPPLY #1 is supplying AC ESS BUS, and the #1 IDG
fails, how is power restored to the AC ESS BUS?
Deselect OVRD SUPPLY #1 then Select OVRD SUPPLY #2 ON