Electrical Flashcards
What is the purpose of the training product for CH-47F Electrical System?
To instruct international military students under specific criteria
Criteria include purchasing equipment through FMS and having an accepted clearance.
What are the major components included in the CH-47F Electrical System?
Electrical component terminology, electrical system general characteristics, AC and DC power supply, power distribution system, malfunctions and emergency procedures.
What is the risk assessment level for the CH-47F Electrical System training?
Low.
List the general electrical concepts and component terminology.
- Switch
- Relay/Contactor
- Circuit Breaker
- Electrical Bus/Bus Bar
- Bus-Tie/Cross-Tie
- Current Transformer/Transducer
Where is the Electrical (ELEC) Power Panel located?
Lower left corner of the overhead switch console.
What does the Battery Low Indicator Light (BAT LOW) indicate?
Illuminates when battery voltage is less than 20 Volts DC.
What is the Kilo-Volt Ampere Hour (KVA) measurement used for?
High output aviation applications requiring continuous and constant output of electrical power on demand.
How much power does 40 KVA equate to in Watts?
32,000 Watts.
What is the primary purpose of the Permanent Magnetic Generator (PMG) in the main AC generator?
To provide a source of electrical power for the generator control unit during normal operation.
What conditions do Generator Control Units (GCUs) monitor?
- Over-voltage
- Under-voltage
- Under-frequency (RRPM)
- Feeder Fault (Short/Open Circuit)
What is the cooling method for the APU generator?
Air-cooled by a built-in fan.
What is the function of the Reverse Current Cutout Relay (RCCO)?
Disconnects its respective Transformer Rectifier from the DC bus and provides a signal to activate the RECT OFF caution.
What are the internal components of the Main Power Distribution Panels that are not visible during pre-flight inspection?
- Contactor Relays
- Reverse Current Cutout Relays
- AC Current Transducers
- Current Transformers
- Battery Chargers
What is the order of priority of power for the DC electrical system from highest to lowest?
- Transformer rectifiers
- External DC power
- Battery
True or False: The battery switch (BATT) must be in the ON position to recharge the battery.
True.
What three DC buses are powered by the battery with the Battery switch in the ON position?
- Battery bus
- Essential 1
- Essential 2
What is the order of priority of power for the AC electrical system from highest to lowest?
- Main AC Generators
- APU Generator
- External AC power
What system allows either main generator to provide electrical power to both buses during a generator failure?
The bus-tie system.
What happens during dual generator failure in terms of electrical management?
Load shedding occurs for both AC and DC systems.
What are the cautions associated with the electrical system?
- Single Generator Caution
- Transformer Rectifier Cautions
- Single Rectifier Caution
- Dual Rectifier Caution