List the AC Power Components
- (2) IDGs (primary) 115 VAC, 400 Hz, 40 KVA
- (1) APU115 VAC, 400 Hz, 40 KVA
- (1) AC GPU Receptacle 115 VAC, 400 Hz, 40 KVA
- (1) RAT - 115 VAC, 400 Hz, 15 KVA
- (1) Inverter 250 VDC to 115 VAC direct to AC STBY BUS
List AC Power Priority
- Onside
- Inside (APU)
- Outside (AC GPU)
- X-Side (Other IDG)
Can one IDG power both AC Buses?
Yes, on ground and in-flight
Can the APU power both AC Buses?
Yes, on ground and in-flight up to FL330
Can the GPU power both buses?
Yes
What does the DISC position on the IDG do?
Disconnects IDG from CSD. If this fails it mechanically shears off the CSD from the IDG
When do you know you need to DISC the IDG?
LOW Oil pressure low
HOT Oil temp high
Amber light is on
Flight crew can reconnect IDG after DISC has been engaged?
No, that is a MX function on the ground
What (2) combinations provide power to accomplish APU START?
- BATTs 1 & 2
- BATTs 1 and DC GPU
Which Battery controls the APU’s FADEC?
BATT 1
Which battery is isolated from the network during APU START to exclusively power the APU START BUS?
BATT 2
What is the minimum VDC required during the Safety & Power On Checklist to consider APU Start?
22 VDC
What is the minimum VDC required to close the battery contactor?
18 VDC
What is the min BATT 2 temp for APU start?
-20º C
The APU is a primary AC source (T/F)
False
How many ways can the AC GPU be turned on?
- AC GPU panel (AC/DC GS Panels & TRU 1)
- (1) Opp. FWD Lav (AC/DC GS Panels & TRU 1)
- (1) Switch Cockpit Overhead Panel (Powers whole aircraft network)
When does the Static Inverter turn on?
Whenever AC power is lost to power the AC STBY Bus which powers Igniters 1A and 2A
There is an altitude and speed restriction for deployment of the RAT (T/F)
False, only speed
When will the RAT deploy automatically?
When both AC buses lose power during an electrical emergency to supply ESS Buses
What is an example scenario you would manually deploy the RAT?
- Auto RAT deployment doesn’t work
- Dual engine failure (1. A/S 250 or > and 2. RAT MAN Deploy)
How long does the RAT take to deploy and are we out of power during that time period?
8 seconds to fully deploy and the batteries power the system
What is the min RAT speed to avoid load shedding?
130 kts
What happens under 130 kts for the RAT?
- RAT only powers AC ESS
- BATTs provide power only to DC ESS and AC STBY (thru static inverter)
- Load shedding continues until AC ESS is no longer powered
What (3) elements comprise the DC Power System
- (3) TRUs (primary) 28VDC, 300A
- (2) NiCad Batteries 22.8 VDC, 27AH
- 1 DC GPU 28 VDC
What does the TRU do?
it rectifies AC power at 115 VAC to 28 VDC
Do the TRUs work in isolation from one another?
yes
The batteries are the primary DC power source?
No, the (3) TRUs are
How are the BATTs charged?
Via any AC power source through the TRUs
How long do you have battery power during an emergency?
10 mins
What does the BATTs backup?
DC ESS Buses and AC STBY
Can the DC GPU charge BATT 2?
No, only BATT 1