Hurricane season for the eastern Atlantic region is June 1st to November 30th.
New York City is most at risk of being affected by a hurricane between
August and
October.
Ensure that Division, Battalion, and Company Commanders have designated a
Storm Operations Coordinator. Commands shall maintain a list of coordinators,
updated
May 1st of each year, and as the need arises
In quarters where flooding is a
problem, the Company Commander shall:
Determine special needs for storm preparation and obtain such supplies and
equipment in advance of the start of hurricane season June 1st
Requisitioning shall commence
March 1st not received by May 1st
shall be called to the attention of the Division Storm Operations Coordinator.
The depth of the water to be crossed should not exceed _____for first line apparatus,
and_____ for FDNY Hi-Axle vehicles.
18” 50”
Phase A
All units assigned portable dewatering pumps shall ensure that such pumps
are placed on the apparatus, in the space previously determined for this
purpose,
48 hours prior to the predicted storms impact
Semi Annual Hydrant inspections
Sept 1st - Dec 1st
March 1st- June 1st
Inspection duty by members with apparatus shall be performed between the
hours of 0930 and 1700 hours.
An officer, or an acting officer, and not less than three firefighters, exclusive of
chauffeur, shall perform inspectional duty
Subway Emergency Exits
Sat and Sun of March and September
Company Commanders forward CT-1
February 1st and August 1st to the Division
FACT
SH900.1 on display
Feb 1st - April 30th
AUC 200 Winter Ops supply requisition begins
JULY 1ST not received by October 1st call Division coordinator
Inspection of Safety equipment
April 15th - June -15 and Sept / october DC inspects rp-100 rp-101
Operational units shall conduct familiarization drills of bridges and tunnels
within their administrative areas under the supervision of Chief Officers. These
drills shall be conducted during the months
of April and October
BOATS
Auxiliary fire protection equipment in tunnels and on bridges, also towers,
shafts and approaches thereto, shall be inspected semi-annually during the
months of .
April and October by the Public Transportation Safety Unit.
In the
event that these inspections cannot be completed by the Public Transportation
Safety Unit, the administrative Division and unit will be notified to assist with
the completion of these inspections
BFUs shall be staffed by a lieutenant and two firefighters from 0900 hours to 1800 hours during the period of
March 17th through April 30th and October 17th through November 30th, on a minimum staffing overtime basis.
The Officer in command of the CFR unit shall submit a CFR Prehospital Save
Form through the bag to the Office of Medical Affairs
within 30 days