What are the RIBA stages?
- Strategic Definition
- Preparation and Briefing
- Concept Design
- Spatial Coordination
- Technical Design
- Manufacturing and Construction
- Handover
- Use
What is the cross section of a carriageway?
Surface course (25-50mm), Binder course (50-100mm), sub-base and base (~200mm each)
Will vary slightly depending on the type of carriageway (type 0 to 4) in accordance with SROH (based on MSA - millions of standard axles)
Can you give an example of a sustainable solution on the LFFN project?
Pre-formed chambers made of GRP - recyclable material:
- less machinery
- less wet trades
- faster and cheaper
- less repetitive movement
Can you talk me through the process of installing a duct?
Once other utilities have been identified using CAT and genny, the process for installing new civil ducting is:
a. Break out existing surface with a jackhammer and a roadsaw
b. Excavate using an excavator or hand dig (depending on width restrictions) – utilities will be laid ~350mm deep
c. Compact bottom of the trench using a compact rammer
d. Lay type 1 hardcore bedding and the ducting in the trench
e. Run upvc / hdpe pipe and fibre optic cable through trenches and fibre joint / core into existing chamber
f. Backfill using excavated material
g. Make good with new surface course
What were the cost savings associated with re-routing the ducting?
~£7k - rate for laying in CW compared to FW & V is significantly higher + TM costs
You mention you are aware of the legislation and regulations that apply to telecoms and gas assets, can you pick out some of the regulations?
SROH
NRSWA
CDM
Street works uk / NJUG
HAUC
Cadent gas codes and specficiations
Guidance - HSE - HS(G)47 Avoiding Danger from Underground Services