Checklist Procedures Flashcards
1
Q
Starting APU:
- DC Voltage > ___
- EGT Rise within ___ seconds. Max EGT = ___
- ________ and _____ lights on by ___ seconds.
- _______ light extinguished by ____ seconds.
A
- 18V
- 9 seconds/880 C
- NORM SPEED // PRESS NORM //20 second
- AUTO CONT ON // 30 second
2
Q
STBY GEN VOLTAGE ___ to ___ VDC
A
27-29 VDC
3
Q
Engine Start:
1. ____ and ____ lights - ON
2. N1 rise within __ to ___ seconds
3. PTIT indications between ___ to ___ % N1
4. Blades turning between ___ to ___ % N1
5. ENG Oil Pressure > __ kgf/cm2 at ___ % N1
6. ____ and ____ pressure increasing
7. AUTO CONT ON light OFF at ___seconds
8 STARTER ON light OFF at ___ to ___ %N1 or at ___ +/- _ seconds
A
- AUTO CONT ON // STARTER ON
- N1 // 3-5 seconds
- 18-21 % N1
- 20-25% N1
- 1 kgf/cm2 // 45% N1
- MGB and Hydraulic Pressure
- 30 seconds
- 60-65%N1 // 55 +/- 4 seconds
4
Q
AC Rotary Knob - Check STBY INV, A, B, C phases, Generators 1 and 2 A, B, C phases ____ to ____ VAC
A
115-119 VAC