Chapter 51,52,53. Roof &flashing Flashcards

1
Q

A square is the amount of roofing required to cover how many feet?

A

100ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

One roll of 15# asphalt felt will cover about how many squares?

A

4 squares

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When applying felt on a roof deck as underlayment, lap each course over course by at least between how many inches?

A

2-4inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The self-stick material used under shingles in high leak prone areas like eaves is called?

A

Ice and Water underlayment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When cutting eave starter strips, it is important to:

a. cut the shingle lengthwise, removing the width of one exposure
b. cut the first eave starter shorter than a full-tab shingle
c. have the sealing tabs at the bottom of the strip.
d. all of these

A

all of these

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Laying out rake edge starters requires the starters to be:

a. cut 6 to 8 inches shorter for each course
b. installed so end seams of nearby courses align
c. nailed so end seams of next course align over nails
d. all of these

A

all of these

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Nailing for asphalt shingles should be located____ the self-sealing strip

A

below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In high wind locales, cement ties are installed on roofs completely covered first with?

A

90# asphalt roll attached in bitumen

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Most wood shingles and shakes are made from:

a. cypress
b. redwood
c. western cedar
d. all of these

A

Western cedar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The longest available length of wood shingles and shakes is:

a. 16 inches
b. 18 inches
c. 24 inches
d. 28 inches

A

c. 24 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Wood shingles normally overhang the fascia by:

a. 3/8 inch
b. 1 inch
c. 1 1/2 inches
d. 2 inches

A

c. 1 1/2 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When applying shakes, it is important to place underlayment_______ above the bottom edge of the shingle.

a. 12 inches
b. 20 inches
c. one exposure width
d. two exposure widths

A

d. two exposure widths

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The type of flashing used when installing shingles to butt a wall is called____flashing:

a. eaves
b. step
c. valley
d. closed

A

b. step

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The first step in installation of roll roof valley flashing is installing:

a. an 18 inch wide flashing piece faceup
b. an 18-inch wide flashing piece facedown
c. a full width flashing piece faceup
d. a full width underlayment

A

b. an 18-inch wide flashing piece facedown

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When nailing shingles near a valley, do not locate any nails closer to the centerline than:

a. 6 inches
b. 8 inches
c. 10 inches
d. 12 inches

A
  1. inches
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Step flashings cut about 8 inches wide should be bent so that:

a. 3 inches lay on the wall and 5 inches lay on the roof
b. 4 inches lay on the wall and 4 inches lay on the roof
c. 5 inches lay on the wall and 3 inches lay on the roof
d. 2 inches lay on the wall and 6 inches lay on the roof

A

b. 4 inches lay on the wall and 4 inches lay on the roof

17
Q

The type of valley where shingles are installed over top of the valley is called:

a. open or close valley
b. metal and woven valley
c. closed cut or woven valley
d. rolled roofing or metal valley

A

c. closed cut or woven valley

18
Q

An open valley should be wider at the bottom than the top by an amount of:

a. 1/8” per foot of valley
b. 1/2” per foot of valley
c. 2 inches total
d. 4 inches total

A

a. 1/8” per foot of valley

19
Q

A built-up section between the roof and the upper side of chimney is called a:

a. cricket
b. dutchman
c. furring
d. counterflashing

A

a. cricket

20
Q

When flashing a chimney, the first pieces of flashing are installed_______side of the chimney:

a. upper
b. lower
c. windy
d. either left or right

A

b. lower side

21
Q

The type of flashing installed on mortar joints over top of other flashing called:

a. step
b. apron
c. counter
d. chimney

A

c. counter