Chapter 4.9 and 4.11 Flashcards
Q01: Verification objective is to answer the following question (choose 1):
A. Am I building the system right?
B. Am I building the right system?
C. Am I building the right system right?
D. Am I right building the system?
A
Q02: Which of the following are inputs for Verification process (choose 2):
A. System requirements
B. Project infrastructure
C. Integrated system or system elements
D. Validation criteria
A/C
Q03: Which of the following are outputs of Verification process (choose 3):
A. Updated RVTM
B. Verification procedure
C. Verification report
D. Verified system
B/C/D
Q04: Which of the following are basic verification activities (choose 3):
A. Demonstration
B. Certification
C. Test
D. Simulation
A/C/D
Q05: Which of the following is true about Qualification (choose 1):
A. The system qualification requires that all V&V actions have been successfully performed
B. The system qualification requires that relevant V&V actions have been successfully performed been performed
C. The system qualification requires that all V&V actions have been performed
A
Q06: “The validation process is invoked during the Stakeholder Requirements Definition process to confirm that the requirements properly reflect the stakeholder needs and to establish the validation criteria”. Is it right? (choose 1):
A. Yes
B. No
A
Q07: Which of the following are outputs of Validation process (choose 2):
A. Validation criteria
B. Validation procedure
C. Validated system
D. Installed system
B/C
Q08: Which of the following are correct (choose 3):
A. Validation is a transverse activity to every life cycle stage of the system
B. Validation can be fully performed in simulated operational environment
C. Validation is performed once the system has been deployed in its operational environment
D. Validation can be invoked before and after transition
A/B/D
Q09: Which of the following is true regarding Verification (choose 1):
A. Verification is only applied on the stakeholder needs and requirements
B. Verification can starts only if all system elements are available
C. Verification can be performed on engineering elements representing the SOI (models, mock-up, …)
D. It is better to start Verification when the system is mature
C
Q10: Which of the following are true regarding Verification and Validation (choose 2):
A. Verification is used to show compliance with the specified system requirements and to detect errors/defects/faults.
B. Validation is used to show compliance with the specified system requirements and to detect errors/defects/faults.
C. Verification is to prove the satisfaction of the desired operational capability through showing operational scenarios and stakeholder requirements can be met.
D. Validation is to prove the satisfaction of the desired operational capability through showing operational scenarios and stakeholder requirements can be met.
A/D
Q11 : Which three of the following are steps in the activities of perform validation of the Validation Process? (Choose 3)
A. Develop the validation procedures that support the validation actions.
B. Ensure readiness to conduct validation availability and configuration status of the system/item, the availability of the validation enablers, qualified personnel or operation, resources, etc.
C. Record anomalies observed during the Validation Process.
D. Conduct validation actions in accordance with the procedures. This should include performing the actions in the operational environment or one as close as possible.
A/B/D
Q12 :Which four of the following are outputs of the Validation Process? (Choose 4)
A.Validation strategy
B. Validation report
C.Validated system
D.Integration Report
E.Validation constraints
A/B/C/E