Chapter 4.4 to 4.11 Flashcards

1
Q

Q01: Which of the following are inputs for Architecture Definition process (choose 3)?
A. Design traceably
B- System requirements
C. Implementation strategy
D. Life-cycle constraints

A

A/B/D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Q02: Which of the following are outputs of Architectural Definition process (choose 3)?
A. Preliminary Technical performance measures needs
B. System elements requirements
C. Documentation tree
D. System architecture description

A

A/C/D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Q03: Which of the following are activities of Architectural Definition process (choose 2)?
A. Develop architecture viewpoints
B. Asses alternatives for obtaining system elements
C. Define the configurations of the afgregates to be built and verified
D. Relate the architecture to design

A

A/D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Q04: Which basic method is commonly used to optimize the number of interfaces for a physical system? (Choose 1)
A. Partitionning of physical entities
B. Coupling matrix / N2 diagram
C. Verification of aggregates
D. Separation of system elements

A

B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Q05: Which three of the following logical models are used to best address key stakeholders concerns? (Choose 3)
A. Communication
B. Definition
C. Behavioral
D. Temporal
E. Functional

A

C/D/E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Q06: The Architecture Definition Process includes which three of the following activities? (Choose 3)
A. Prepare for architecture definition
B. Develop architecture viewpoint
C. Define system budget requirement
D. Develop models and views of candidate architectures
E. Manage the business or mission analysis

A

A/B/D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Q07: Which of the following are inputs for Design Definition process (choose 3)?
A. Stakeholder requirements
B. System requirements
C. Implementation traceabilty
D. Preliminary Technical performance measures needs

A

B/C/D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Q08: Which of the following are outputs of Design Definition process (choose 3)?
A. Technical performance measures needs
B. Interface definition
C. System element descriptions
D. Design requirements

A

A/B/C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Q09: Manage the design is one of the activities included in the Design Definition Process. Manage the design focuses on: (Choose 3)
A. Capture and maintain the rationale for all selections among alternatives and decisions for the design, architecture characteristics, design enablers, and sources of system elements.
B. Provide baseline information management
C. Maintain the design baseline and the design definition strategy
D. Establish with stakeholders that their requirements are expressed correctly
E. Record stakeholder requirements in a form suitable for maintenance throughout the system life cycle

A

A/B/C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Q10: Which of the following statement are true about Design Definition process (choose 2)?
A. It focuses more on the “what” than the “how”
B. It focuses more on the “how than the “what”
C. System design make the link between architecture and implementation
D. System design make the link between requirements and functions

A

B/C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Q11: Which three of the following use the System Analysis Process? (Choose 3)
A. Mission and Business Analysis Process to analyze and estimate candidate OpsCon and/or candidate business models related to a potential SOl in terms of feasibility, costs, risks, and effectiveness.
B. Stakeholder Requirements Definition Process to analyze Issues relating to conflicts among the set of requirements, in particular those related to feasibility, costs, technical risks, and effectiveness (mainly performances, operational conditions, and constraints).
C. Entrepreneurial product development process in anticipation of futures sales
D. Coordination process with other engineering disciplines
E. Integration Process, Verification Process, and Validation Process to estimate the related strategies

A

A/B/E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Q12: Which of the following are activities of the system analysis process (choose 2)?
A. Define the scope of required analyses
B. Plan for technology management
C. Determine the candidate elements to be analysed
D. Allocate concepts that are significant to architecture decisions

A

A/C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Q13: Which of the following are outputs of implementation process (choose 3):
A. Implementation strategy
B. System elements
C. Operator/maintainer training materials
D. System elements requirements

A

A/B/C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Q14: Which three of the following are steps in the Prepare for Implementation of the Implementation Process? (Choose 3)
A. Define fabrication/coding procedures and tools and equipment to be used, implementation tolerances, and the means and criteria fro auditing configuration of resulting elements to the detailed design documentation.
B. Conduct hardware audits.
C. Elicit from stakeholders, developers and teammates any constraints imposed by implementation technology, strategy, or implementation enabling systems.
D. Document the plan for acquiring or gaining access to resources needed during implementation
E. Identify results.

A

A/C/D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Q15: Which three of the following does the implementation Process include? (Choose 3)
A. Fabrication
B. Synthesis
C. Development
D. Operational resources
E. COTS adaptation

A

A/C/E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Q16: Which of the following are integration techniques (choose 3):
A. Incremental Integraton
B. Fast integration
C. Bottom-up integration
D. Criterion driven integration

A

A/C/D

17
Q

Q17: Which one of the following best describes the Integration Process? (Choose 1)
A. The Integration Process works closely with the Operation Process.
B. One of the inputs of the Integration Process is the integration strategy, which is used to check that all boundaries between the system elements have been identified
C. During the Integration Process the Verification Process is invoked to check that the individual system elements have been correctly identified.
D. There is a strong focus on the interfaces to ensure that the intended operation of the system elements and interoperation with other systems is achieved.

A

D

18
Q

Q18: Verification objective is to answer the following question (choose 1):
A. Am I building the system right?
B. Am I bulding the right system?
C. Am I building the right system right?
D. Am I right building the system?

A

A

19
Q

Q19: Which of the following is true regarding Verification (choose 1):
A. Verification is only applied on the stakeholder needs and requirements
B. Verification can start only If all system elements are available
C. Verification can be performed on engineering elements representing the SOI (models, mock-up, …)
D. It is better to start Verification when the system is mature

A

C

20
Q

Q20: Wish of the following are outputs of Verification process (choose 3);
A. Updated RVTM
B. Verification procedure
C. Verification report
D. Verified system

A

B/C/D

21
Q

Q21: Which of the following are basic verification activities (choose 3):
A. Demonstration
B. Certification
C. Test
D. Simulation

A

A/C/D

22
Q

Q22: Which of the following are inputs for Transition process (choose 3):
A. Installation procedure
B. Operator/Maintainer training material
C. Verification report
D. Final RTM

A

B/C/D

23
Q

Q23: Which three of the following statements accurately describe the Transition Process? (Choose 3)
A. The Transition Process is a relatively long process.
B. The Transition Process installs a verified system in the operational environment along with relevant enabling systems, products, or services
C. The Transition Process does not include training the users in the proper use of the system and affirming users have the knowledge and skill levels necessary to perform operation and maintenance activities.
D. The Transition Process ultimately enables the transfer of custody of the system and responsiblity for the system support from one organizational entity to another.
E. Successful condusion of the Transition Process typically marks the beginning of the utilization stage of the SOl.

A

B/D/E

24
Q

Q24 : Which among these activities is not part of the Transition Process (Choose 1) :
A - Manage results of transition
B - Prepare for the transition
C - Analyse for the transition
D - Perform the transition

A

C

25
Q

Q25: Which of the following are outputs of Validation process (choose 2):
A - Validation criteria
B - Validation procedure
C. Validated system
D. Installed system

A

B/C

26
Q

Q26: “The validation process is invoked during the Stakeholder Requirements Definition process to confirm that the requirements properly reflect the stakeholder needs and to establish the validation criteria”. Is it right? (choose 1):
A. Yes
B. No

A

A