Chapter 4 UREs Flashcards
- (025) What is easy to perform once the missile engine has been placed on the handling truck assembly?
A. Wiring
B. Soldering
*C. Visual inspection
D. Heat shrink application
- (025) Once a missile has been placed on the MHU-159, where do you ground the stand?
A. Stand frame
B. Electrical box
*C. Facility ground
D. To any other grounded item
- (026) The fuel/defuel set bleed down tank is used to hold the fuel removed from which missile tanks?
A. 1 and 3 during fueling operations.
*B. 2 and 3 during fueling operations.
C. 1 and 3 during defueling operations.
D. 2 and 3 during defueling operations.
- (026) What is the purpose of the fuel/defuel set hygrometer?
A. Calculate fuel loading pressure
*B. Determine fuel moisture content
C. Calculate nitrogen loading pressure
D. Determine nitrogen moisture content
- (026) Which fuel/defuel set filters prohibit solid and liquid particles from entering the nitrogen and air systems?
A. 1 and 2
B. 2 and 3
C. 3 and 4
*D. 4 and 5
- (026) Which fuel/defuel set skid component contains the majority of gauges, valves, and switches required for operation of the fuel set?
A. Flow monitoring panel
B. Master hygrometer set
C. Operation center
*D. Control panel
- (026) Which fuel storage tank valve prevents an overflow of fuel during servicing by shutting off fuel flow at the facility fuel supply inlet to the fuel set?
A. 74
*B. 75
C. 76
D. 77
- (027) What provides system requirements for basic testing requirements when they cannot be provided by the ESTS?
A. Support equipment and plug in units
B. Plug in units and TAG
C. Special adapters and TAG
*D. Support equipment and TAG
- (027) Which is not an electronic system test set checkout capability?
A. B-52H empty pylon check
B. B-52H loaded pylon check
C. B-52H CSRL empty nuclear bomb check
*D. B-52H CSRL loaded nuclear bomb check
- (028) The ESTS computer that controls, sequences, and evaluates the operation of the entire ESTS is located in which rack of the ESTS?
*A. Main
B. Air data test set
C. Cathode-ray tube display station
D. Unit under test power control rack
- (028) During testing with the ESTS, the UUT and required pieces of support equipment are grounded directly to
A. the facility ground.
*B. the isolation ground plate.
C. separate grounding points.
D. the cable tray above the ESTS.
- (028) What provides an interface between the operator and the ESTS that allows the operator to control and monitor all ESTS operations from a central location?
A. Main rack
B. Air data test set
*C. CRT display station
D. UUT power control rack
- (028) Which is not one of the types of printouts avaialble from the ESTS printer?
A. As run
*B. File run
C. List source
D. Logged data
- (029) Which ESTS systems use 1A3 computer data?
*A. Analog stimuli and digital
B. Digital and monitor and interrupt
C. Digital and temperature control and cooling
D. Power distribution and monitor and interrupt
- (029) What are the two sections of the ESTS switching system?
A. Measurement input switching and analog output switching.
B. Measurement output switching and analog input switching.
*C. Measurement input switching and double pole double throw (DPDT) switching
D. Measurement output switching and single pole single throw switching.