Chapter 3 UREs Flashcards
- (017) Which option runs the entire Level 1 missile test?
A. Restart
*B. End-to-end
C. Start-to-finish
D. Inertial navigation element autocalibration
- (017) Where are the test options displayed after electronic systems test set initialization?
*A. Cathode-ray tube
B. Digital control unit
C. Missile test assembly
D. Air data test set display
- (017) Which test option declassifies the INE if the missile operational program is loaded?
*A. Memory declassification
B. Restart with declassification
C. INE autocal
D. Air vehicle digital computer unit memory dump
- (018) What priming fluid does the APPU fill the missile fuel lines with during engine priming?
A. 16
B. 17
C. 5
*D. 1
- (019) In addition to grounding and bonding what additional action si mandatory after maintenance is completed when talking about electro-magnetic pulse hardness?
A. Continuity check
*B. Visual inspection
C. Physical inspection
D. Visual and physical inspection
- (019) Where will you find the HCP symbol in a paragraph if only some of the steps pertain to HCPs?
A. At the end of the paragraph
B. At the beginning of the paragraph
C. Immediately following HCP steps
*D. Immediately preceding HCP steps
- (020) During fuel priming operations, when are hose connections made?
A. During engine change
B. During Level 1 testing
*C. Prior to allowing fuel flow
D. After an end-to-end check is run
- (020) What type of a gas system is used in the fuel/defuel set that provides purging and pressurization of the fuel system?
*A. Nitrogen
B. Pure oxygen
C. Filter helium
D. Filtered oxygen
- (020) Which technical order do you reference concerning the fuel/defuel stands?
A. 21M-AG-3-1
B. 21M-AG-2-1
C. 21M-AGM-2-1
D. 11N-W80.83-2
- (021) When performing threaded insert repair, what part of the hole may not be increased when replacing inserts without an engineering evaluation?
A. Cap
*B. Depth
C. Width
D. Thread
- (022) Two tasks primarily involved in missile electrical repairs are the splice removal and splice
A. joint.
B. solder.
C. replacement.
*D. installation.
- (022) What is used to secure recently repaired electrical wires?
A. Tape
*B. Cable ties
C. Wire wraps
D. Velcro straps
- (023) Why are abbreviations used on diagrams?
*A. Prevent clutter
B. Allow comparison
C. Show energized circuits
D. Show de-energized circuits
- (023) Which type of diagram, also known as block diagram, is designed to provide the technician with the essential units of the overall system?
A. Wiring
B. Schematic
*C. Functional
D. Blueprint foldout
- (023) What do the lines usually represent within a block diagram?
A. Distance
B. Resistance
*C. Signal path
D. Direction of flow