Chapter 1 UREs Flashcards
- (002) Which missile maintenance position is responsible for ensuring work areas are prepared for the shift’s maintenance tasks?
*A. Bay chief
B. Technician
C. Flight chief
D. Flight commander
- (001) As a recent technical training graduate being assigned to the missile maintenance section, what is your priority to complete?
A. Hands-on training
B. Computer-based training
*C. Career development course
D. Squadron in-process checklist
- (002) Who is responsible to the team chief and must properly use and care for all assigned tools and equipment?
*A. Technician
B. Training instructors
C. Special weapons technician
D. Quality assurance evaluator
- (003) Which AF program provides monetary awards for cost savings ideas?
A. Technical order change incentive
*B. Innovative design through employee awareness (IDEA)
C. AF awards through airmen participation
D. Incentive-based design through airmen participation
- (003) When completing an AFTO Form 22, you do so electronically and submit the form via
A. I-pad
*B. E-mail
C. Notepad
D. Secured data lines
- (004) During maintenance, what is used to show the status of equipment or components removed from missiles, and are used in conjunction with shipping procedures for some items?
*A. Tags
B. Forms
C. Stickers
D. Templates
- (004) Which condition tag would you use on a piece of equipment that is considered condemned and not repairable?
*A. Red
B. Blue
C. Green
D. Yellow
- (005) What term is used to label those specific items directly related to nuclear weapons and require special handling and control?
A. Nuclear war required items
B. Nuclear war related material
*C. Nuclear weapons related material
D. Nuclear weapon system related items
- (006) Which area within the IMF accommodates cruise missiles that contain JP-10?
A. Low bay
B. High bay
*C. Fuel room
D. Engine bay
- (006) Which storage facility, normally located near the IMF, houses missiles without warheads installed?
A. Lite missile igloos
B. Unarmed missile igloos
C. Potential missile facility
*D. Unarmed weapons storage facility
- (006) What equipment is the primary user of compressed air within the IMF?
*A. Cooling control unit (CCU)
B. Electronic system test set (ESTS)
C. Simulated launcher pylon
D. Rotary launcher electronic system test set
- (007) In order to be a part of a two-person team, you must first obtain certification under which program?
A. Security
B. Buddy care
*C. Personnel reliability
D. Positive identification