All LP gases shall be _____ prior to the delivery to a bulk plant by the addition of a warning agent of such character that the gases are detectable by a distinct odor.
Odorized
Odorized gas shall be blended to a concentration and air of not over _______ the lower limit of flammability
1/5th
If odorization is required, the presence of the odorant shall be determined by _______ or by other means
Sniff – testing
Odorized gas results Shall be documented when LP gas is delivered to a ______
Bulk plant
Odorized results shall be documented as follows, when shipments of LP gas ____ the bulk plant
Bypass
Plans for stationary installations, utilizing storage containers with aggregate water capacity exceeding ________ gallons Shall be submitted to the authority having jurisdiction before installation is started by the person or company that either installs or contracts to have the containers installed
4000 gallons, and all rooftop installations of ASME containers
The authority having jurisdiction shall be notified of temporary installations of container sizes covered in 4.3.1 _________ the installation has started
Before
When temporary installations exceed ______ , approval shall be obtained
12 months