BIM and RIBA PoW Flashcards

1
Q

What does BIM stand for?

A

Building Information Modelling

BIM is a collaborative way of working underpinned by digital technologies.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the primary benefit of using BIM in construction?

A

Increases efficiency and saves time by flagging issues within the system

This reduces the need for variation orders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What does 3D in BIM refer to?

A

Creating graphical and non-graphical information and sharing in a Common Data Environment (CDE)

It allows for model walkthroughs and detailed project data handover.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How does 3D modeling help in construction?

A

Helps with clash detection and early identification of potential problems

This prevents extra costs and stops variation orders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What does 4D modeling in BIM add to a project?

A

Scheduling data and visual representation of the structure at each stage

It allows for accurate project planning.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What information does 5D modeling provide?

A

Real-time costing estimates based on the BIM model

It enables valuable tools for designers for value engineering.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the purpose of 6D modeling in BIM?

A

To evaluate energy efficiency and life cycle costs of a building

It becomes an ‘as built’ model for maintenance workers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What does PoW stand for?

A

Plan of Works

It is embedded into the BIM process to meet project requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does CDE stand for?

A

Common Data Environment

It is used for sharing project information.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Is BIM just a software tool?

A

False

BIM is a technology and process that enhances collaboration.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

List some key components of the BIM process.

A
  • Fabrication
  • Scheduling
  • Site logistics
  • Facilities management
  • Construction and worker safety
  • Programming
  • Conceptual design
  • Construction documents

These components work harmoniously under BIM.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What does the BIM process map represent?

A

The BIM implementation process for enhanced collaborative working

It improves BIM planning and deployment across the project lifecycle.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the stages of the BIM process map?

A
  • Strategic definition
  • Preparation and briefing
  • Concept design
  • Special coordination
  • Technical design
  • Manufacturing construction
  • Handover
  • Use

These stages outline the lifecycle of a building project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Fill in the blank: BIM is the information management process spanning the lifecycle of a building with a focus on _______.

A

semantically rich 3D models

This emphasizes the importance of data in BIM.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly