BAL-002 Disturbance Control Performance Flashcards
1
Q
The purpose of BAL-002-2 Disturbance Control Standard is to…
A
- Ensure the BA or Reserve Sharing Group balances resources and demand
- Returns its ACE to defined values following a Reportable Balancing Contingency Event
2
Q
True or False
The Disturbance Control Standard applies to
- A loss of Generation
- A loss of load
A
False, DCS is limited to the loss of generation
3
Q
Contingency Recovery Period
A
15 minute time period in which a BA or a Reserve Sharing Group have to return their ACE to acceptable parameters following a Reportable event.
4
Q
MSSC
A
Most Severe Single Contingency
5
Q
Reportable Event
A
any event occurring within a one minute interval of an initial decline in ACE that results in a loss of MW output less than or equal to MSSC and greater than or equal to 80% of MSSC