BAL-002 Disturbance Control Performance Flashcards

1
Q

The purpose of BAL-002-2 Disturbance Control Standard is to…

A
  • Ensure the BA or Reserve Sharing Group balances resources and demand
  • Returns its ACE to defined values following a Reportable Balancing Contingency Event
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

True or False
The Disturbance Control Standard applies to
- A loss of Generation
- A loss of load

A

False, DCS is limited to the loss of generation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Contingency Recovery Period

A

15 minute time period in which a BA or a Reserve Sharing Group have to return their ACE to acceptable parameters following a Reportable event.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

MSSC

A

Most Severe Single Contingency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Reportable Event

A

any event occurring within a one minute interval of an initial decline in ACE that results in a loss of MW output less than or equal to MSSC and greater than or equal to 80% of MSSC