B2103 - RPV temperature instrumentation Flashcards
What is the purpose of the RPV temp instrumentation?
Monitors RPV water and metal temps during normal ops, start-up, shutdown, and post accident conditions
When does the bolt up temp alarm come on?
75 deg F
What is the lowest temp you can bolt the head on the Rx?
Why?
70 deg F
Because bolt up tension on metal colder than 70 deg F could cause cracking
Where is temp taken for thermal interlocks?
Dome pressure converted to temp (condensing chamber)
Where is core thermal power calculated from?
Feedwater temp calculation by cyclops computer
What are the cavitation interlocks for Recirc pump?
Narrow – < 7.4 delta T between dome and suction
(downshift)
What are the thermal interlocks for recirc pump?
Wide – > 50 deg F loop to loop or loop to dome,
> 100 deg F dome to drain
These prevent start or upshift
What is the purpose of the reactor head vent?
to vent non-condensables during heat up and start up
Where does the reactor head vent vent to?
Drywell equipment drain sump
What does the “ADS/SRV LEAK HI” mean?
the head vent to drywell eq drain sump is indicating >155 deg F
What should be done < 190 deg F head vent to drywell eq drain sump temp?
swap to Main Steam line A