B2103 - RPV temperature instrumentation Flashcards

1
Q

What is the purpose of the RPV temp instrumentation?

A

Monitors RPV water and metal temps during normal ops, start-up, shutdown, and post accident conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When does the bolt up temp alarm come on?

A

75 deg F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the lowest temp you can bolt the head on the Rx?

Why?

A

70 deg F

Because bolt up tension on metal colder than 70 deg F could cause cracking

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Where is temp taken for thermal interlocks?

A

Dome pressure converted to temp (condensing chamber)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Where is core thermal power calculated from?

A

Feedwater temp calculation by cyclops computer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the cavitation interlocks for Recirc pump?

A

Narrow – < 7.4 delta T between dome and suction

(downshift)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the thermal interlocks for recirc pump?

A

Wide – > 50 deg F loop to loop or loop to dome,
> 100 deg F dome to drain

These prevent start or upshift

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the purpose of the reactor head vent?

A

to vent non-condensables during heat up and start up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Where does the reactor head vent vent to?

A

Drywell equipment drain sump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What does the “ADS/SRV LEAK HI” mean?

A

the head vent to drywell eq drain sump is indicating >155 deg F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What should be done < 190 deg F head vent to drywell eq drain sump temp?

A

swap to Main Steam line A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly