ATA 24 (B777 AMM Part 1) Flashcards
The backup generators are: (B2)
a. an IDG type
b. a constant frequency AC generator type
c. a variable-speed, variable-frequency type
C
The standby power switch OFF position makes the static inverter stay off:
(B2)
a. any time.
b. on the ground
c. In the air.
B
The P110 left power management panel and the P210 right power management panel control load shedding. These panels: (B2)
a. can shed loads independently only
b. always operate together (interpanel operation)
c. can shed loads independently or operate together dependent on the availability of the powersources
C
The ELMS can possibly shed and restore all loads four times in about one minute. If you use an external power source with: (B2)
a. less than a 60 KVA capacity at an external power receptacle,
b. less than a 90 KVA capacity at an external power receptacle
c. less than a 180 KVA capacity at an external power receptacle
B
The primary sources of electrical power are: (A1, B1, B2)
a. The integrated drive generators (IDGs) only
b. The integrated drive generators (IDGs) and the APU generator
c. The integrated drive generators (IDGs), the APU generator and External ground power
(A)
IDG can not be reconnected at the line maintenance if disconnected:(B1, B2)
a. accidentally by flight or ground crew
b. automatically due the IDG oil gets too hot.
c. manually due to low oil pressure
(B)
The IDG oil level data on the electrical maintenance page and the sightglass is not accurate until you wait a minimum of: (B1, B2)
a. 5 minutes after engine shutdown
b. 10 minutes after engine shutdown
c. 30 minutes after engine shutdown
(A)
The maintenance page will show NORMAL when the backup generator is shutdown, if: (B1, B2)
a., the backup generator oil level is too low (If oil does not cover the underfill sensor)
b. the backup generator oil level is too high (if oil covers the two - underfill and overfill -sensors).
c. oil covers the underfill sensor, but not the overfill sensor of the backup generator
(C)
The primary power source for the backup converter is: (B1, B2)
a. the left backup generator.
b. the right backup generator
c. alternatively between two backup generators at next power up
(B)
The OFF light on the BACKUP GEN switch comes on when: (B1, B2)
a. Engine fire switch is pulled out
b. Backup generator converter is faulty
c. GCU is faulty
(A)
For the main ac electrical power generation system, there are: (B2)
a. two replacement tests
b. three replacement tests
c. four replacement tests
(C)
To do operational test for the backup electrical power system, you must: (B2)
a. use the ground power unit
b. operate the engine
c. start the APU
(B)
When other power sources are not available, supply dc power to important equipment will be from: (B2)
a. The main battery
b. The main battery components, including Battery charger
c. possibly the APU battery components
(B)
For fiber nickel-cadmium (FNC) batteries: (B1, B2)
a. Maintenance is required at A check interval
b. Maintenance is required at C check interval
c. No maintenance is necessary
(C)
The due care must be taken when replacing the main battery on the aircraft, because when no other power is on the airplane: (B2)
a. the hot battery bus supplies power to the static random access memory (SRAM) of the AIMS.
b. the database of the FMS will be erased
c. the ADIRU alarm will sound.
(A)
The cell imbalance condition occurs when (B2)
a. the voltage of the first 10 battery cells is different from one half of the battery voltage
b. the charging current is higher than 100 A
c. the Overheat switch closed (160 oF (70 oC))
(A)
The four TRUs normally get power from: (B2)
a. the main AC buses
b. the transfer buses
c. the backup generators
(B)
Standby DC power comes from: (B1, B2)
a. either the RAT generator or the main battery
b. either the backup generators or the main battery main battery
c. either the hot battery bus or the main battery
(A)
The static inverter is an alternative power source for the AC standby bus and supplies: (B2)
a. single phase, 26V AC power
b. single phase, 115v ac power.
c. three-phase, 115v ac power
(B)
The RAT can be deployed automatically when: (B1, B2)
a. the airplane is in the air and all hydraulic power systems unpressurised for more than 15seconds
b. the airplane is in the air and the two transfer buses do not have power for more than 15seconds
c. the airplane is in the air and the AC standby bus does not have power for more than 15
seconds
(B)
Which of the FCDC power supply assemblies (PSA) does not get power from Hot battery bus? (B2)
a. The left PSA
b. The right PSA
c. The center PSA
(B)
To prevents the FCDC loads from draining the main battery and the related FCDC battery, if you replace a primary flight computer (PFC), before removing power from the airplane you must open: (B2)
a. the related FCDC circuit breakers
b. the battery interlock circuit breaker of the related PSA.
c. the related PSA circuit breakers
(B)
The external power panel has two external power receptacles with the forward receptacle is for: (B2)
a. primary external power
b. secondary external power.
c. either primary or secondary external power.
(A)
The ground handling AC bus can NOT be supplied from: (B1, B2)
a. the APU generator
b. primary external power
c. secondary external power
(C)