API 570 Flashcards

0
Q

And imperfection of a type of magnitude exceeding the acceptable criteria

A

Defect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Physical change of the piping component that has design applications affecting the pressure containing capabilities of flexibility of the piping system is an

A

Alteration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

An __________ could be flaws or other types of discontinuities that were discovered during inspection that might be subject to some code acceptance criteria during further analysis

A

Imperfections

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

MDMT is the __________. __________ at which a significant pressure load can be applied to piping system as defined in applicable construction code

A

Lowest temperature

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Injection points subject to accelerated or localized corrosion may be treated as

A

Separate inspection circuits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Pressure relieving devices should be tested and inspected at

A

Frequent enough intervals to make sure the PRDs perform reliably in service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Barlow formula for t

A

t= PD/2SE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Remaining life formula

A

t actual - t required / corrosion rate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Long term corrosion rate formula

A

t initial - t actual / years between

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Short term corrosion rate

A

t previous - t actual / years in between

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Any welding conducted on piping components in operation must be done in accordance with

A

API publication 2201

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

All repair and alteration welding to piping systems shall be done in accordance with the

A

Principles of ASME B31.3 or the code to which it was built

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How often should cathodically protective buried piping be monitored to assure adequate levels of protection

A

Regularly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How often should above grade visual surveillance of a buried pipeline right-of-way be made

A

Approximately six month intervals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How often should poorly coated pipes with inconsistent cathodic protection potentials have a pipe to soil potential survey made

A

Every five years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The leak test for buried piping should be for a period of

A

Eight hours

16
Q

Barlow formula for MAWP

A

MAWP= 2SET / D. T is projected thickness

17
Q

Services with the highest potential of resulting in an immediate emergency if it leak were to occur are in class

A

1

18
Q

Services not included in other classes or in class? This classification includes the majority of unit process piping and selected offsite piping

A

2

19
Q

Services that are flammable but do not significantly vaporize when they leak and are not located in high activity areas or in class? Services that are potentially harmful to human tissue but are located in remote areas may be included in this class

A

3

20
Q

Services that are essentially nonflammable and non-toxic or in class? As are most utility services. Inspections of this class of piping is optional and usually based on reliability needs and business impacts as opposed to safety or environmental impact

A

4