What resources should you ensure you have before doing a task?
Personnel
Equipment/spares
Documentation
Facilities
What does physical work over a period of time result in?
Fatigue
What can be the issue with an engineer becoming too familiar with a task?
They can become complacent and not refer to the manual to check for procedural changes.
What can be used in a visual check that humans can’t see?
NDT techniques such as Eddy current or fluorescent penetrant inspection.
What can a complex system be thought of as?
A system with multiple inputs and a single or multiple outputs.
What is a transparent system?
A system that the engineer fully understands.
What is an opaque system?
A system which the engineer knows to some extent, but may need supplement material to guide.