8. Technical Analysis Flashcards

1
Q

What are the eight (8) factors affecting Technical Analysis?

A
  1. Objectives
  2. Location and Site
  3. Plant Size
  4. Technology
  5. Design, Layout, Plant, & Machinery
  6. Construction Process
  7. Infrastructural Facilities
  8. Manpower
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Project proposal will depend on two (2) sectors on the stated mission of investors and enablers.

A
  1. Private Sector

2. Public Sector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

This should be identified as many as possible which meet the most fundamentally operational requirements of proposed projects.

A

Location and Site

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Considered appropriate only if it is assessed to be satisfactory and relevant; vis-a-vis the following aspects.

A

Technology

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Any under utilization of its capacity mean either reduced pofits or, for levels below Break Even point ot losses.

A

Plant Size

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

To design a viable operating entity which not only works, but works harmoniously in relation to be stipulated inputs and local environment.

A

Design, Layout, Plant, & Machinery

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the four (4) factors under Location and Site?

A
  1. Criteria of Material vs Market Orientation
  2. Quality Standards
  3. Infrastructural Status, Local Laws
  4. Socio-economic and Living Conditions
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

These relate to the operational phase of project, but need to be identified to examine the technical easibility of the proposed system/s.

A

Inputs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Availability and characteristics of roads, bridges, railway facilities, air transportations, waterways, port, etc.

A

Infrastructural Facilities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Availability in needed numbers, of manpower of requisite skills where and when required, has to be studied.

A

Manpower

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

One of the things to consider in Location and Site is the Local _________ and its Impact on Plant and Equipment and their Operations.

A

Climate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

TRUE OR FALSE?

Political structure is one of the other things to consider in Location and Site.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The first question to ask in cosidering Technology, “Is the technology available as a technical _________ or through a technical ____________, or a joint venture?

A
  • knowhow

- collaboration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Under the Construction Process, the recommended sequence and time schedule of different activities are in the form of bar chart or _______ network.

A

PERT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the six (6) essential inputs in Technical Analysis?

A
  1. raw materials
  2. processed materials
  3. components and sub-assemblies
  4. spares and wear & tear parts
  5. water and steam
  6. gas, fuel, and electricity
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The three factors affecting Plant Size are:

  1. availability of materials, technology, and ___________
  2. public __________
  3. ___________
A
  1. equipment
  2. policy
  3. finances
17
Q

This is also refers to costing.

A

Technical Analysis

18
Q

TRU OR FALSE.

One of the factors under Objectives is Manufacturing and Production Process.

A

True

19
Q

One of the factors under Objectives is __________ Materials and their Resources.

A

Raw

20
Q

TRUE OR FALSE.

There is a question regarding legal obligations in the bounds of Technology.

A

True