6 Electrical Flashcards

1
Q

🟧 TR UNIT
FLT
GND

A

FLT: TR 1 failed OR TR2 + TR3
GND: any TR fail

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

🟧 ELEC

A

fault in DC power system OR standby power system, ONLY ON GROUND

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

BATTERY SWITCH
OFF
ON (guard)

A

OFF
- removes power from batt bus and switches hot batt bus when operating with normal power source available
- removes power from batt bus, switched hot batt bus, dc standby bus, static inverter and AC standby bus when batt is only power source

ON
- provides power to switched hot batt bus
- energizes relays to provide automatic switching of standby electrical system to battery power with loss of normal power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

🟧 DRIVE
illuminate when:
IDG disconnects when

A

IDG low oil pressure caused by: IDG failure, ENG shutdown, IDG disconnect through GEN DRIVE DISCONNECT SWITCH. HIGH OIL TEMP

electrical power available + ENG start lever at IDLE. Can NOT be reconnected in AIR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

🟧 STANDBY PWR OFF

A

when one or more are unpowered: AC STBY BUS, DC STBY BUS, battery bus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

AC STDBY BUS powered by
DC STDBY BUS powered by

A

Normal: AC transfer bus 1, loss of all AC power: by batt through Inv
Normal: TR1,2,3, loss of all AC power: by batt

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

🟦 GEN OFF BUS
🟧 SOURCE OFF
🟧 TRANSFER BUS OFF

A

IDG not supplying power to related transfer bus

no source selected to power transfer bus OR source bus has been disconnected

related transfer bus not powered

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Generator switches

A

(dis)connects IDG to transfer bus by opening/closing Generator Circuit Breaker

disconnecting previous power source when gen switches switched On

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

BUS transfer switch OFF

A

isolates transfer bus 1 from transfer bus 2, if IDG is delivering power to both AC transfer busses: BTB both open and cross bus tie relay opens and TR3 is to the right

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

APU generator switch

A

powers related L or R transfer bus, the non-selected side will remain powered by ENG IDG

Disconnects previous power when selected ON

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Aircraft Primary Power
- parallel
- selecting new source
- divisions

A

2 ENG IDG 3 phase 115V 400 Cycle AC
P - NO paralleling of AC source of power
S - Selecting new source automatically disconnects existing source
D - AC power, DC power, STBY power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

AC power system
- powered from
- BTB in flight when IDG stops
- AUTOMATIC GEN ON feature

A

P - either external power or APU, not both powering separate busses. If IDG is selected on Gen 1/2, other bus will still be powered from apu/ext power.
B - BTB automatically closes when IDG delivery power stops
A - IDG automatically connects to transfer busses when APU shuts down/fails

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

AUTOMATIC LOAD SHEDDING, with ONE generator
- priority
- config change
-manual restore

A

P - galley + main bus on transfer bus 2 sheds first, than from transfer bus 1. When overload still exists: IFE busses are shed
C - when more power available, auto restore
M -attempted by CAB/UTIL switch OFF than On

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

AUTOMATIC LOAD SHEDDING APU
- IN FLT
- GND
- Manual restore

A

I - with APU only source of electrical power, all galley busses and main busses automatically shed. Not sufficient, IFE busses are shed
G - APU attempts to carry full load, still overload, APU shuts down galley busses + main busses until load within limits
M - CAB/UTIL OFF than On

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

IDG
- lubricated and cooled
AC voltage and frequency meter for:
AC ammeter for:
DC Voltage and amperage
DC voltage

A

L - by self-contained oil system
A - STBY power, ground power, generator APU, GEN 1and 2 and static inverter
A - generator IDG’s 1/2 and APU
D - (aux) batt and each of three TR
D - STBY power and batt bus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

DC power

A

28V power supplied by 3 TR’s

17
Q

TR
- purpose
- transfer bus switch auto
- how many TR to carry full load

A
  • converts 115AC to 28V DC
  • TR3 powered by Transfer bus 2 and back up from transfer bus 1
  • 2 tr carry full load
18
Q

Cross Bus tie relay
Opens automatically when:

A
  • at GS capture during FD or A/P ILS approach, this isolates DC busses during approach to prevent a single failure from affecting both NAV receivers and flight control computers
  • bus switch in OFF position
19
Q

Battery power
- Power
- Operation
- 2 batteries
- loss of both Generators, the battery powers:
- hot batt bus

A

P - Dual 24V nickel-cadmium batteries, main and auxiliary located in electronics compartment.
O - Aux batt operates in parallel with main batt, when batt is powering STBY system
2 - sufficient to power stby power for at least 60 min
L - batt bus, dc stby bus, hot batt bus, switched hot batt bus,
H - ALWAYS connected to the battery

20
Q

Primary batt charger

A

charges hot batt bus and switched hot batt bus. Also powers batt bus when TR3 fails

21
Q

AUX BATT

A

normally isolated from batt, but works parallel with it when main batt is powering stby system

22
Q

STBY power switch to off

A

de-energizes both AC and DC STBY bus, and switched hot batt bus.

23
Q

static inverter

A

converts 24V DC from batt to 115V AC power

24
Q

STBY power system V

A

24V