47 SPECS/SYSTEMS Flashcards
LOA with rubrails
48’11”
LOA without rubrails
47’11”
Length at waterline
43’
Beam without rub rails
14
Beam with rub rails
15’
Freeboard bow
6’8”
Recess freeboard
2’2”
Aft freeboard
7’1”
NAV draft
4’6
Height @ radar
18’6”
Height of mast
24’6”
Height of antenna
28’4”
Weight of 47
40,000lbs
Max personnel with crew
34
Max speed
25kts @2100RPMS
Cruise speed
20kts @1850
Cruise range
200NM
Max wind, seas,surf
50kts, 30ft seas, 20ft breaking Waves
Max towing with 3 1/4 line
150 gross tons
200 with a waiver
Ice breaking capabilities
Light surface ice
Coast stop
400ft in 1 min 10 sec
Crash stop
150ft in 9 sec
Seven major components of DDEC
Engine governing Cold start fueling and timing Engine protection & diagnostics Injection timing Rated speed &power Sensor calibrations Smoke control
DDEC 6V92 TA stands for
Detroit diesel, electrically controled, 6 cylinder, V block, 92 cubic inches rise and fall per piston, Turbo Aftercooled
The engine is how many cubic inches total
558
The engine has how much breaking horsepower
435HP @2100RPM
How many water witches are on the boat in total
15, 1 on each EWRS window
2 for most bilge pumps
Raw water system is located where?
Diameter of the filters
GPM
Inbetween Frames 4 and 5.
4” filters
67 GPM
What are the 5 purposes of the raw water cooling system?
Maintain fuel oil temps below 90F Cool the lube oil Cool red gear lube oil Cool steering fluid Cool and quiet exhaust
Steering system head pressure
20-30 PSI
Steering system fluid type
Tellus T-15
47MLB prop diameter x pitch # of blades
28” diam 36” pitch. 4 bladed prop
Red gears name propulsion type
REINTJES WVS 234 UP
Cardin shaft to prop shaft ratio
2:1
Red gear fluid quantity and type
7.1 gallons of 30 weight
Fuel capacity and useable
100% 394
95% 373
Fuel temp should be kept below what?
90°f
Engine lube oil type quanity
40 weight
5.5 GAL
Lube oil filter
10 micron simplex
The hull is constructed of
5456 marine grade aluminum
How many compartments are there
7
How many locations are there on the bildge alarm panel
5
Water witches
15 total, 2 @ almost every pump first one is @ 5” for alarm, 2nd one is @ 10” for the pump to turn on
Laz frames
Transom to bulk head
ENG room frames
1-5
Survivors
5-8
Aux machinery space
8-10
FWD comp
10-15
Forepeak
15- bow point
Enclosed bridge frame
8-10
Installed CO2 fire suppression system
1of 3 activation stations go to your 2 25 lb CO2 bottles then go to your first pressure switch. This is ur air shut offs, pre discharge light, and 10% of ur siren. Then it hits ur 30 second delay bottle, u can manually by pass this bottle. After the 30 second delay bottle it hits pressure switch number 2 this is ur discharge light.lastly is pressure switch number 3 this is the engine room dampener. And then CO2 is discharged above STBD side MDE
What temperature does the metal rod in the engine room have to reach in order for it to activate the installed fire suppression system?
190°F
Fire extinguishers?
2 5lb CO2
2 10lb PKP
One of each in the survivors comp and enclosed bridge
Righting arm
Vessels tendency to return upright.
Decreases between 70° & 110° of heel before it increases drastically. Beyond 110° the righting arm increases dramatically acting to right the vessel.
Average minimum time for a 47 to accelerate to full speed is ?
40 seconds over 0.2 NM
The boat idles @
5-6 kts
Piviot point
Wind screen
A full rudder/ throttle turn of 180° takes?
20 seconds to complete
Height of eye is how many ft?
14ft
Max amount of ice covering entire boat in HWX
3/4”
Average time under water in roll over
8-12 seconds
3 ways to activate EWRS
Automatic
Manual
Back up CO2
EWRS is
Emergency window release system, air compressor located on the STBD side of frame 8. Same compressor used for the horn. Windows automatically release in case the enclosed bridge floods, allows Free access to the sea
Where is the HF antena
Stbd side black box in the enclosed bridge
DF
Simrad Tayio
diffrence between ‘Ship” and ‘Coast”
ship is used when looking for a lost ship, coast is used when we are looking for the Station, or land. the dirence in the two is the MgHz of the CH
Diameter of prop shaft
2.5”
side plating thickness
1/4”
chine thickness
3/8”
bottom plating
5/16”
keel plating
1/2”
we fill to 95% so not to over flow. 16 gallons of that is not usable due to the pick up being 2 inches off the deck of the tank. what is the usable fuel?
357 Gal
Fire suppression system: pressure switch 1
activates strobe light inside the engine room, pre discharge light outside of the engine room(color), and shuts off the the engines (solenoids)
Fire suppression system: pressure switch 2
activates discharge light
Fire suppression system: pressure switch 3
mechanical pressure switch that closes air dampener located behind the ladder to the open bridge
Fire suppression system: 3 actuation stations
in between stidd chairs enclosed bridge, outside engine room, on the Co2 bottles in the AUX space.
what do the red, black, and non colored rings on the 24V panel in the AUX space mean
red is component of DDEC, black is non essential, and no color ring means do not secure.