4.3 - RIGGING Flashcards
Breaker Rigging (4.3) !!!!!
Breaker Rigging (4.3) !!!!!
1/4 Ton Chain Motor? ($), (#), (cd)
($125), (#4), (.25t)
1/2 Chain Motor? ($), (#), (cd)
($150), (#8), (.5t)
1/2 ton Chain Motor Comes with these additions? 1) 2) 3)
1) 4 Way Power Distro (208 with cam tie in’s) 2) 4-Way Remote Controller 3) Rigging Kit (12 count span set and shackles)
1/4 Chair Motor comes with these additions?
1)
2)
1) Rigging Kit (12 count)
2) 1/4 Ton Remote Controller (with power cables)
1/4 Ton Remote Control? ($), (#)
($10), (#10)
1/2 Ton Chain Motor Power Distro? ($), (#), (CD)
($350), (#2), (.5CHAIND)
1/2 Ton Chain Motor 4 Way Remote Control?($), (#)
($50), (#3)
1/2 Chain Motor runs off this kind of power?
208v
1/4 Chain Motor runs off this kind of power?
120v
1/2 Ton Chain Motor Power Distro ties in to company power with this kind of connector?
Cam Lock
How do you get 208 power from a company switch?
Tie in (2) hot legs
Mina array speakers have these additional rigging elements?
1)
2)
3)
1) Rig Kit (12 count span sets and shackles)
2) Mina Fly Rig (top casing shelf with multiple rig points)
3) Motors
You can run ‘about’ this many feet of truss with 2 motors?
30’
For something to be flown it should be: 1) 2)
1) Traceable (to the manufacturer) 2) Rated (for being flown)
When trussing extends beyond where motor attaches .. should do this for under 5’?
Cantalevered
The two parts that make up trussing?
Should have motors at this many feet for 12” box truss?
30’
The shackle should be arranged this way
So that the open end of the U is facing UP, with the PIN through it.
The spansets should be wrapped ?
around both the bottom and top cords of the trussing.
Riggers fee structure?
1) 8a - 5p
2) 5p - 12a
3) 12a - 8a
4) Weekends /Holidays
1) Normal Time ($95)
2) Time and a half ($142.50)
3) Double Time ($190)
4) Double Time ($190)
A type of clamp that let you attach a piece of trussing to 90* angle to another piece of trussing without a corner block.
Grapple
Two kinds of truss dressing
Wrap Teaser
trussing should meet like this?
with the struts making an (A)
Rig load capacity of the Venetian and Ponce Points?
750 lbs
Rig load capacity of Med Ponts?
250 lbs
rigging we are motors down
groups can provide their own truss if they want