4160V Flashcards
State what 13.8 bus duct fault causes
Opens:
- Associated 345kV Breakers
- MGB for UAT bus duct fault
- 13.8 kV incoming Line breaker
- 4160 V incoming line breaker
List causes of UAT incoming Supply Breaker trip
UAT/ Bus duct faults 345 bus 6/ 25kV Isophase bus fault Switchgear enclosure fault Breaker failure (11,12, MGB) GSU fault
List causes of RAT incoming Supply Breaker trip
RAT/ bus duct faults
345 kV Bus 5 fault
Switchgear enclosure fault
Breaker failure (345 kV 52, 695)
List bus 3 and 4 UV auto actions
Trips large loads (94 relays)
-CO pumps first
-HD pumps next
Block RAT auto-transfer
List bus 3 and 4 RAT Breaker Auto-Transfer
Sync exits or existed within the last 1 second Bus Voltage <17% and UAT breaker begins to open - remote only Available for 2.0 sec
List Bus 5 and 6 Breaker Auto-transfer
Sync exits or existed within the last 1 second Bus Voltage <25% and UAT breaker begins to open - remote only Available for 1.2 sec
List first and second level undervoltage
1st level:
- <70% voltage for > 1.2 seconds with RAT available
- <70% voltage w/o RAT
2nd level
- <95% rated voltage with an SI signal for >6 seconds
List Bus 5 and 6 UV Auto actions
Trips large loads (94 relays)
Block RAT auto-transfer
UAT and RAT blocked open by RMO for Diesel to power bus