3M Flashcards
6 Boxes to fill when etagging out
- Tag-out CS-DANGER-2023
- Type Danger
- Description De-energize fan at switch and wait a minimum 20 seconds (to allow fan motor to stop)
- Reason/Applicable Documentation 5121 M-7, CSOSS SD 2/VENT
- Work To Complete 5121 M-7 Inspect Type II Magnahelic Differential Pressure Gauge. Step 1.a.(2)
- Hazards/Amplifying Instructions ELEC SHOCK
eTagout FQDN
https://mfom.ddg82.navy.mil/etagout
Create tag for tag out
- New Line Item
- Search the equipment you will be working on
- Add component to tag out
Component to work on and component to tag out are almost always different. Always start the e-tag line item with the item you will work on while the source of energy is tagged out.
Tag-out and Danger to choose (filling eTag out form)
Choose current year. Caution for risk only for equipment, Danger for risks that can result in bodily harm.
Description (filling eTag out form)
“Copy paste” step in the MRC that requires the tag-out
Reason/Applicable Documentation (filling eTag out form)
MIP, periodicity, tag out manager on watch /type of component
example: 5121 M-7, CSOSS SD 2/VENT
Work To Complete (filling eTag out form)
MIP, periodicity, MRC description, Step where tag-out is required
example: 5121 M-7 Inspect Type II Magnahelic Differential Pressure Gauge. Step 1.a.(2)
Hazards/Amplifying Instructions
What risks are associated with the component being tagged out.
example: ELEC SHOCK
Types of Feedback Report
Technical Non-technical Urgent
Urgent Feedback Report
72 hrs off the ship
safety 7 days to take action
MSDS (3M)
Material Safety Datasheet
SPIMIG
Standard PMS Identification Material Guide
What is the intent of 3-M training events?
To establish baseline knowledge, provide in-depth training in deficient areas, and enable commands to self-assess and correct 3-M discrepancies.