3.8.2 AC Sources - Shutdown Flashcards

1
Q

3.8.2 AC sources shutdown:

The following AC electrical power sources shall be OPERABLE:

A

One circuit between the offsite transmission system network and the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.10

And

One Diesel Generator capable of supplying one train of the onsite class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3.8.2

Applicability:

Note:

A

Modes 5 and 6,
During movement of irradiated fuel assemblies

During modes 1, 2, 3, and 4, Required Actions of A.2.3 and B.3 are not applicable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

3.8.1

A. One required offsite circuit inoperable

A

NOTE: Enter applicable conditions of LCO 3.8.10, with one required train de-energized as a result of condition A

A.1 Declare required feature(s) with no offsite power available inoperable (Immediately)

OR

A.2.1 Suspend CORE ALTERATIONS (immediately)
AND
A.2.2 Suspend movement of irradiated fuel assemblies
AND
A.2.3 Initiate action to suspend operations involving positive reactivity additions (immediately)
A.2.4 Initiate action to restore required offsite power circuit to OPERABLE status (immediately)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3.8.2

B. One required DG inoperable

A

B.1 Suspend core alterations (immediately)

AND

B.2 Suspend movement of irradiated fuel assemblies (Immediately)

AND

B.3 Initiate action to suspend operations involving positive reactivity additions (Immediately)

AND

B.4 Initiate action to restore required DG to OPERABLE status (Immediately)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly