3.8 Electrical Power Systems Flashcards

1
Q

3.8.1 AC Sources Operating

A

The following AC Sources shall be Operable
A. 2 qualified offsite circuits
B. 2 DGs
C. 1 U1/2 offsite circuit able to support ESW
D. U1/2 DG able to support ESW

Modes 1, 2, 3, and 4

Note: U1/2 elec sources in c and d not required to be op when ESW is inop

A. 1 req offsite source inop
A.1 Perform offsite source checks - 1 hr
B. 1 req DG inop
B.1 Verify both supp DGs are avail - 1 hr
B.2 Peform offsite source checks - 1 hr
H. 3 or more req AC sources inop
H.1 LCO 3.0.3 - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3.8.2 AC Sources - Shutdown

A

The following AC source shall be Operable
A. 1 offsite circuit to power equipment required by LCO 3.8.10
B. 1 DG to power equipment required by LCO 3.8.10

Mode 5 and 6
During fuel moves in ctmnt, aux build, and U2 ctmnt

A. Required offsite source inop
A.1 Declare affected required features with no offsite power avail inop
OR
A.2.1 Suspend core alts and
A.2.2 Suspend fuel moves and
A.2.3 Suspend pos react adds
A.2.4 Initiate action to restore offsite circ

B. Required DG inop
B.1 Suspend core alts and
B.2 Suspend fuel moves and
B.3 Suspend pos react adds
B.4 Initiate action to restore offsite circ

All action Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

3.8.3 Diesel Fuel Oil

A

Stored diesel fuel oil subsystem shall be within limits for each required DG

When DG required to be operable

D. Required action and comp time not met or 1 or more DG with fuel oil not within limits for reasons other than Cond A, B, or C
D.1 Declare associated DG inop - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3.8.3 DC Sources - Operating

A

The following electrical power subsystems shall be operable
A. Trn A and B 250 VDC elec pwr
B. Trn N 250 VDC elec pwr
C. U1/2 Trn A and B 250 VDC capable of supporting ESW

Modes 1, 2, 3, and 4

Note: Trn N not required in Mode 4

D. Train N inop
D.1 Declare TDAFP inop - Immediately

E. 1 or both U1/2 Trn A and B elec pwr inop
E.1 Declare associated ESW inop - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

3.8.5 DC Sources - Shutdown

A

One Trn A or B 250 VDC elec pwr subsystem shall be operable to support required by LCO 3.8.10

Mode 5 and 6
During fuel moves in ctmnt, aux building, and U1/2 ctmnt

A. Required DC elec pwr subsystem inop
A.1 Suspend core alts and
A.2 Suspend fuel moves and
A.3 Suspend pos react adds and
A.4 Initiate action to restore required DC
All actions immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

3.8.6 Battery Parameters

A

Battery parameters for Trn A, B, N, and U1/2 Trn A and B shall be within limits

When associated DC elec pwr subsystems required to be operable

F. Required action and comp time of Cond A, B, C, D, or E not met or 1 or more batt float volt <2.07 V and float current > 2 amps or SR 3.8.6.6 not met.
F.1 Declare associated batt inop - immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

3.8.7 Inverters - Operating

A

The Train A and B inverters shall be Operable

Modes 1, 2, 3, and 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

3.8.8 Inverters - Shutdown

A

2 inverters shall be operable to support 1 train of 120 VAC required by LCO 3.8.10

Mode 5 and 6
During fuel moves in ctmnt, aux build, and U1/2 ctmnt

A. 1 or more required inverters inop
A.1 Suspend core alts and
A.2 Suspend fuel moves
A.3 Suspend pos reac adds
A.4 Initiate action to restore inv
All actions immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

3.8.9 - Distribution Systems Operating

A

The following power dist subsystems shall be operable
A. Trn A and B AC elec dist systems
B. Trn A and B 120 VAC vital bus
C. Trn A and B 250 VDC elct dist
D. Trn N 250 VDC elct dist
E. U1/2 Trn A and B elct dist and 250 VDC elect dist required to support ESW

Modes 1, 2, 3, and 4

Note:
Trn N not required in Mode 4

E. Req Trn N inop
E.1 Declare TDAFP inop - Immediately

F. 1 or more req U1/2 elect dist inop
F.1 Declare associated ESW trn inop - Immediately

G. 2 or more elec dist systems that cause loss of safety func
G.1 Enter LCO 3.0.3 - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

3.8.10 Distribution System - Shutdown

A

Necessary portions of AC, DC, and 120 VAC vital bus systems shall be operable to support equipment required to be operable

Modes 5 and 6
During fuel moves in ctmnt, aux build, and U1/2 ctmnt

A. 1 or more req AC, DC, or 120 VAC vital bus elect pwr dist systems inop
A.1 Declare assoc supported required features inop OR
A.2.1. Suspend core alts and
A.2.2 Suspend fuel moves and
A.2.3. Suspend pos reac adds and
A.2.4 Init actions to restore req pwr and
A2.5 Declare assoc req RHR inop and not in operation
All actions Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly