3.7.1 Main Steam Safety Valves

A

5 MSSVs per steam generator shall be operable

Modes 1, 2, and 3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3.7.2 Steam Generator Stop Valves

A

4 SGSVs and their associated actuator trains shall be operable

Mode 1
Mode 2 and 3 except when all SGSVs are closed

D. 2 SGSV actuator trains inop on same SGSV
D.1 Declare affected SGSV inop - Immediately

E. 3 or more SGSV actuator trains inop or completion time of A, B, or C not met
E.1 Declare each affected SGSV inop - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

3.7.3 Main feedwater isolation valves and main feedwater regulation valves

A

4 MFIVs and 4 MFRVs shall be operable

Modes 1, 2, and 3 except when MFIV or MFRV is either closed and de-activated or isolated by closed man valve.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3.7.4 S/G PORVs

A

4 S/G PORVs shall be operable

Mode 1, 2, and 3
Mode 4 when S/G relied upon for heat removal

D. 1 or more required S/G PORV inop in mode 4
D.1 Initiate action to restore - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

3.7.5 AFW System

A

3 AFW trains shall be operable

Mode 1, 2, and 3
Mode 4 when S/G required for heat removal

E. 3 AFW trains inop in mode 1
E.1 Initiate action to restore 1 AFW train to operable - Immediately (LCO 3.0.3 suspended)

F. Required AFW train inop in mode 4
F.1 Initiate action to restore - immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

3.7.6 CST

A

The CST shall be operable

Modes 1, 2, and 3
Mode 4 when S/G required for heat removal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

3.7.7 CCW

A

2 CCW trains shall be operable

Modes 1, 2, 3, and 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

3.7.8 ESW System

A

2 ESW trains shall be operable

Modes 1, 2, 3, and 4

Note: When ESW train xtied with associate U1/2 ESW train, Operability includes associated U1/2 ESW Pump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

3.7.9 Ultimate Heat Sink

A

The UHS shall be Operable

Mode 1, 2, 3, and 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

3.7.10 Control Room Emergency Ventilation System

A

2 CREV trains shall be operable

Modes 1, 2, 3, and 4
During movement of fuel in ctmnt, aux build, and U1/2 ctmnt

B. 1 or more CREV trains inop due to inop CRE M1, 2, 3, or 4
B.1 Initiate action to implement mitigating actions - immediately

E. Req action and comp time of A not met during fuel moves
E.1 Place op CREV train in press/clean up mode or suspend movement of fuel - immediately

F. 2 CREV trains inop during fuel moves or 1 or more CREV trains inop due to inop CRE during fuel moves
F.1 Suspend fuel moves - Immediately

G. 2 CREV trains inop M1, 2, 3, or 4 for reasons other than Cond B and C
G.1 Enter LCO 3.0.3 - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

3.7.11 2 Control Room Air Conditioning System

A

2 CRAC trains shall be operable

Modes 1, 2, 3, and 4
During movement of fuel

C. Required action and completion time of Cond A not met during fuel moves
C.1 Place operable CRAC train in op or suspend fuel moves - Immediately

D. 2 CRAC trains inop during fuel moves
D.1 Suspend fuel moves - Immediately

E. 2 CRAC trains inop in M1, 2, 3, or 4
E.1 Enter LCO 3.0.3 - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

3.7.12 Engineered Safety Features Ventilation System

A

2 ESF ventilation trains shall be Operable

Modes 1, 2, 3, and 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

3.7.13 Fuel Handling Area Exhaust Ventilation System

A

1 FHAEV train shall be operable and in operation

During fuel moves in aux building

A. Required FHAEV train inop or not in operation
A.1 Suspend fuel moves - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

3.7.14 Fuel Storage Pool Water Level

A

The SFP water level shall be >/= 23 ft over top of fuel assemblies seated in storage rack

During fuel moves in SFP

A. Water level not within limit
A.1 Stop fuel moves - Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

3.7.15 SFP Boron Concentration

A

SFP boron concentration shall be >/= 2400 ppm

When fuel assemblies in SFP and fuel storage verification has not been performed since last fuel move in SFP

A. Boron concentration not within limit
A.1 Stop fuel moves and
A.2.1 Initiate action to restore boron conc
Or
A.2.2 Initiate action to perform SFP verification
All action Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

3.7.16 Spent Fuel Pool Storage

A

Initial enrichment and burnup of each fuel assembly stored in region 2 or 3 shall be within acceptable burnup criteria

When fuel stored in region 2 or 3

A. Requirements of LCO not met
A.1 Initiate action to move noncomplying fuel from region 2 or 3 - Immediately

17
Q

3.7.17 Secondary Specific Activity

A

The specific activity of secondary coolant shall be </= 0.10uCi/gm dose equiv I-131

Modes 1, 2, 3, and 4