What are the contents for the Fire depot ?
4 x 30m LENGTHS OF DURALINE FIRE FIGHTING HOSE (38mm diameter) 1 x DIVIDING BREECH 2 TO 1 2 x QRT BRANCHS WITH JET NOZZLES 12-15MM ORIFICE 2 x FOG NOZZLES 1 x QRT TO MINSUP ADAPTOR 2 x HYDRANT SPANNERS 2 x FIRE EXTINGUISHERS MINIMUM CAPACITY OF 4KG 80ABE
How often are the Fire Hydrants in Mains and development?
- Mains 400m
- Development 100M
List the locations of fire Depots?
5 required
Fire Depots shall be located
- At least every 400 metres along belt roadways
- Approximately 25 metres on the intake side of Boot ends Conveyor transfer points Conveyor drive heads Permanent flammable liquid stores End of all Fire Fighting line Oil Depots / Fuel bays
list the contents of the fire and entrapment trailor?
15 required
- 5 x 30m Lengths Of Duraline Fire Fighting Hose (38mm Diameter)
- 2 x 30m Length Of Duraline Fire Fighting Hose (64mm Diameter)
- 2 x 30m Lengths Of Water Hose (20 Or 25mm Diameter Fitted With Minsup Ends)
- 3 x One Into Two Breeching Pieces (Fitted With Manually Operated Cut-Off Valve)
- 8 x Branch Pipes (And Nozzles With 12mm Or 15mm Diameter Outlets)
- 8 x Fog Nozzles 4 x Hydrant Spanners
- 6 x Fire Extinguishers With Minimum Capacity Of 4KG 80ABE
- 1 x Low Expansion Foam Branch
- 1 x Turbex High Expansion Foam Generator
- 12 x 20 Litre Drums Of Foam 6 %
- 30m turbex poly ducting
- 4 x Bushman saws
- 7 x short handled shovels (Round) Element
- 2 x Long handled shovels (round)
- 3 x 4lb Sledge Hammers
- 1 x 14lb Sledge Hammer
- 2 x 12Lb Sledge Hammers
- 4 x Pelican Picks
- 2 x Picks
- 2 x Measuring sticks
- 2 x Crow Bars
- 3 x Axes
- 2 x Rolls of Brattice cloth
- Tool Box:
- 2 x Brattice guns
- 3 x boxes brattice staples,
- 2 x Ball peen hammers
- 3 x tape measures
- 2 x Holmatro Air lift Bags + operating valves and gauges
- 6 x timber props
- rolls No Road Tape
- 3 x Air spears
list the 3 designated places of safety?
- Level 1 or T1 crib room
- Level 2 or T2 Pit Bottom
- Level 3 T3 Surface of the mine
List the periodic exercises to test the emergency system under the SHMS?
- Level 1 state wide Yearly,
- Level 2 Whole mine site Yearly,
- level 3 Crews Panel yearly
- Level 4 Desktop Scenarios,
What are the location of first aid places at Cook?
- Crib rooms,
- Ambulance,
- Drift runners,
- Surface First aid room.
Where are the Trama kits found at Cook?
- Crib rooms,
- Ambulance,
What are the inspection requirements for Entonox?
ERZ
Pulse
- inspected every shift by ERZ,
- WO off pulse every 6 months
When do you not give Entonox to a patient.?
- Head Injuries
- chest injuries
What is entonox?
- 50% each of Oxygen and Nitrous oxide
How often are water Take off points on the Longwall?
- every 10 chocks
How often is the communication on a longwall face?
- Dacs every 10 chocks
How often is the communication on a Trunk Conveyor?
- Dacs every 200 M