205.15A Papago Tunnel Response Flashcards
There are hydrant cabinets in the two vehicle tunnels located approximately every ________ on alternating sides of the tunnel.
300 ft (600 ft same side)
The maximum volume of traffic is ________ autos/hour/tunnel.
8,000
A four-way fire department standpipe connection to support the wall hydrant system is located on ________.
Culver, 50 feet west of Central
Intake fitting on the connection are 2 1/2”
What is the most direct access to the tunnel?
Off 7th Ave and 7th St
There are two vehicular tunnels. How many lanes of traffic in each direction?
Five
Each tunnel also has two emergency lanes
Four access doors provide access from the transit tunnel to the vehicular tunnel (two on eastbound side and two on westbound side). Where are they located?
Approximately 1/3 of the way from the vehicular entrance/exit points
The access doors are located from the transit side. Where are the lockboxes?
Mounted next to the door
Each tunnel has mechanical ventilation. There are ______ ventilation rooms, ______ for each tunnel that control airflow.
4 ventilation rooms
2 for each tunnel
What does each ventilation room control?
Lighting
Ventilation
Fire detection
CO monitoring
Emergency telephone communications
How can the ventilation room be accessed?
On the surface via the structures on the deck
Ventilation rooms have essentially one way in and one way out by means of a long stairwell. There are two separate levels to each room that go to a depth of _____ feet below the surface.
35 feet
The ADOT control room serves as the entry point for the main electrical switchgear. It is located where?
Below Central Ave. overpass on the south side
Access is from the deck park ground level
What serves as a control and communications center for the tunnel?
ADOT control room
There are ____ doors per tunnel, which allow movement between the vehicular tunnel, and the bus transit tunnel.
2 doors per tunnel
Location of the hydrants are indicated by what?
Blue and white hydrant sign
Is the tunnel standpipe system wet or dry?
Wet
There are total of _____ fan rooms, _____ for each vehicular tunnel.
4 fan rooms
2 for each tunnel
Each fan room has ____ fans, so each vehicular tunnel has a total of _____ fans providing ventilation.
2 fans
4 fans total
Each fan room provides power, ventilation and fire protection control to a quadrant of the tunnel. Each ventilation room has a UPS system that provides _____ minutes of bridge power between loss of APS and generator start-up.
15 minutes
Where is each fan accessed?
The deck level
What frequencies will operate in the tunnel?
Fire channels 1, 2, 3 ( VHF)
Med channels 3, and 9 (UHF)
What should members remember when utilizing the radio?
There is a half second time element needed to capture the repeater, the first part of the message can be lost
Repeat your company ID twice at the front-end of the transmission
Will MCT’s operate in the tunnel?
No