201.02 RCS Flashcards
- 201.02 RCS*
- *
Functions of RCS
Transport heat from Rx to S/G.
Act as a moderator and a reflector.
Solvent for neutron absorber.
Second boundary of protection against release of fission product to the public.
- 201.02 RCS*
- *
Describe flowpaths through RCS
Through core - out through hot leg to steam generator. Through S/G U-TUBES through the crossover leg to the suction of the RCP. The pump discharges back into the reactor vessel and core.
RCS piping sizes
Hot Leg 29” ID
Cold Leg 27.5” ID
Intermediate Leg 31” ID
RCS Design Data
Flow Rate -
Total Volume -
Operating Liquid Vol. -
Loop Transit Time -
Rated Thermal Power (RTP) -
Tave -
Design Press -
Life -
Flow Rate - 107,800 gpm per pump
Total Volume - 14,974 ft3
Operating Liquid Vol. - 13,352 ft3
Loop Transit Time - 13.2 sec
Rated Thermal Power (RTP) - 3853 MWt
Tave - 567oF - 593oF
Design Press - 2485 psig
Life - 40 years
- 201.02 RCS*
- *
Function of Interfacing Systems:
Pressurizer
Attainment of operating pressure.
Maintain required pressure.
Limit RCS pressure changes during load changes to allowable limits.
Prevent RCS overpressure.
- 201.02 RCS*
- *
Function of Interfacing Systems:
CVCS
Purify Reactor Coolant
Provide a Means of Chemistry Control
Provide a Means of Varying CB
Maintain RCS Inventory
Supply RCP Seal Water
Provide a Means for Filling, Draining, and Pressure Testing of the RCS.
- 201.02 RCS*
- *
Function of Interfacing Systems:
RHR System
Decay Heat Removal.
Solid Plant Pressure Control in Conjunction with CVCS.
RHR Heat Exchanger used in ECCS.
Transfer Refueling Water from Refueling Cavity to the RWST.
- 201.02 RCS*
- *
Function of Interfacing Systems:
Safety Injection
Provides Borated Water for Emergency Core Cooling in the Event of a LOCA or Steam Break Accident.
- 201.02 RCS*
- *
Function of Interfacing Systems:
Sampling
Provides access to RCS fluids to obtain chemistry samples.
- 201.02 RCS*
- *
Function of Interfacing Systems:
Drains
Drains to RCDT are located on each loop crossover leg low point
2” lines
- 201.02 RCS*
- *
Instrumentation and Controls to monitor / operate:
Loop Avg Temp Fast Response RTDs
HL
(3) T-hots per loop, located on hot leg before SGs.
CL
(1) T-cold per loop, located downstream RCPs.
Used to generate “Tavg” and Delta T
- 201.02 RCS*
- *
Instrumentation and Controls to monitor / operate:
Pressurizer Safety and Relief Valve Discharge Temperatures
PORVs (TI-676), Safeties (TI-677, 678, 679)
RTDs installed in each tailpipe
Generates high alarm (150°F), indicating valve leakage or valve open
- 201.02 RCS*
- *
Instrumentation and Controls to monitor / operate:
Pressurizer Liquid and Vapor Space Temperature
Liquid (TI-608), Vapor (TI-607)
(2) RTDs one in liquid, one in vapor
Indicates saturation in PRZR