0POP03-ZG-0008 Power Operations Flashcards

1
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

If the operator changes feedwater flow, how long must he wait to raise Rx Power using U1118?

A

1 hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

With regards to the controlling Main Turbine Governor valve (normally GV #4), when must power ascension to 100% RTP be halted?

A

60% Open

If limited only by GV position, next step allows you to continue to raise power to 100% GV open.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

When coastdown operations are in progress, what parameters should be maintained?

A

Tavg within ± 1.5 ˚F of Program Tavg

AFD Oscillations ≤ 1.0% peak to peak

Control Bank D 240 - 250 steps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

Who must be notified when the MG VR is placed in Manual?

A

STP Coordinator

Transmission and Distribution Service Provider (TDSP)

Notify within 30 minutes with expected duration (Use 72 hr is time is unknown)

Note:
Must also notify if there is a change in the reactive capability of the MG.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

During coastdown operations, what is the administrative limit for the + AFD Limit?

A

0.5% < Tech spec limit

AFD will become 0.6% more positive for every 1% of power reduction. (Assumes no rod motion)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

What is the target RTP for Units 1 and 2?

A
  • *3852 MWt**
  • 2 hr average ≤ 3853 MWt*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

What are some ways to lower secondary plant efficiency to give the main turbine controlling GV some bite?

A

HP GVs for SGFPTs

HP Main Turbine / MSR crossunder drains

Blowdown Flash Tank Vent

FW-MOV-108 FW Heater 11A/B Bypass Isolation MOV

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

During coastdown operations, how long should the operators wait between power reductions?

A

12 hrs

Xenon concerns

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

If RCS boron lowers to < 200 ppm, how is the RCS then diluted further?

A

BTRS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

When should coastdown operations begin?

A

RCS Boron 5 ppm
OR
Deemed necessary by Operations Plant Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

When reducing power, when can the MG placed in IMP IN?

A

98% RTP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • 0POP03-ZG-0008 Power Operations*
    • *

What should the Tavg band be maintained at during steady state and transient conditions?

A
  • Steady State:*
  • *± 0.5 ˚F of Program Tavg**
  • Transient Conditions:*
  • *± 1.5 ˚F of Program Tavg**

Auctioneered High Tavg should be used as the controlling Tavg channel.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly