0POP03-ZG-0001 Plant Heatup Flashcards
- 0POP03-ZG-0001 Plant Heatup*
- *
After entering MODE 3, how long does the operator have to make the terry turbine OPERABLE?
72 hrs

- 0POP03-ZG-0001 Plant Heatup*
- *
What important pump / valve manipulations are performed PRIOR to entering MODE 3?
Verify ALL LHSI in AUTO
Verify electric AFW pumps in AUTO
- 0POP03-ZG-0001 Plant Heatup*
- *
Above what RCS temperature must the CRDM cooling fans be in operation?
≥ 350 ˚F

- 0POP03-ZG-0001 Plant Heatup*
- *
What should the operator use as the RCS temperature indication when performing a RCS Heatup?
Highest operable cold leg indication

Cold legs with returning RHR flow.
- 0POP03-ZG-0001 Plant Heatup*
- *
How many RCPs should be running if boron or chemicals are added to the RCS?
2 RCPs

- 0POP03-ZG-0001 Plant Heatup*
- *
Above what temperature differential between the SGs and the RCS can the operators no longer start a RCP?
≥ 10 ˚F

- 0POP03-ZG-0001 Plant Heatup*
- *
What is the temperature / pressure limit for having RHR in operation?
350 ˚F
425 psig
Prevents lifting a RHR relief.

- 0POP03-ZG-0001 Plant Heatup*
- *
When must the operator ensure that the #1 RCP seal leakoff isolation valves are opened?
Prior to exceeding 120 psig - 125 psig

May cause misalignment in the #1 RCP seal.
- 0POP03-ZG-0001 Plant Heatup*
- *
What are the administrative heatup limits?
- RCS:*
- *50 ˚F/hr**
- PZR:*
- *100 ˚F/hr**

- 0POP03-ZG-0001 Plant Heatup*
- *
What important pump / valve manipulations are performed within 4 hrs of entering MODE 3 or any cold leg temperature exceeding 375 ˚F?
Ensure both CCP racked in
Ensure PDP breaker closed
Ensure ALL HHSI pumps in AUTO
Should also block COMS when > 350 ˚F
- 0POP03-ZG-0001 Plant Heatup*
- *
What important pump / valve manipulations are performed PRIOR to entering MODE 4?
Containment Spray Pumps to AUTO
Open HHSI Cold Leg Injection Valves
Ensure 2 Trains of LHSI OPERABLE
- 0POP03-ZG-0001 Plant Heatup*
- *
What important pump / valve manipulations are performed within 4 hrs of entering MODE 4 or any cold leg temperature exceeding 225 ˚F?
- *1 HHSI in AUTO**
- Must start HHSI to verify it works*
1 HHSI racked out but NOT tagged
- 0POP03-ZG-0001 Plant Heatup*
- *
When exiting MODE 6, when is MODE 5 entered?
Rx Vessel Head completely tensioned
All adjustment passes made.

- 0POP03-ZG-0001 Plant Heatup*
- *
At what RCS temperature must CCW be in operation to cool the operable RHR seal coolers?
≥ 120 ˚F