0POP03-ZG-0001 Plant Heatup Flashcards

1
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

After entering MODE 3, how long does the operator have to make the terry turbine OPERABLE?

A

72 hrs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

What important pump / valve manipulations are performed PRIOR to entering MODE 3?

A

Verify ALL LHSI in AUTO

Verify electric AFW pumps in AUTO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

Above what RCS temperature must the CRDM cooling fans be in operation?

A

≥ 350 ˚F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

What should the operator use as the RCS temperature indication when performing a RCS Heatup?

A

Highest operable cold leg indication

Cold legs with returning RHR flow.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

How many RCPs should be running if boron or chemicals are added to the RCS?

A

2 RCPs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

Above what temperature differential between the SGs and the RCS can the operators no longer start a RCP?

A

≥ 10 ˚F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

What is the temperature / pressure limit for having RHR in operation?

A

350 ˚F

425 psig

Prevents lifting a RHR relief.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

When must the operator ensure that the #1 RCP seal leakoff isolation valves are opened?

A

Prior to exceeding 120 psig - 125 psig

May cause misalignment in the #1 RCP seal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

What are the administrative heatup limits?

A
  • RCS:*
  • *50 ˚F/hr**
  • PZR:*
  • *100 ˚F/hr**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

What important pump / valve manipulations are performed within 4 hrs of entering MODE 3 or any cold leg temperature exceeding 375 ˚F?

A

Ensure both CCP racked in

Ensure PDP breaker closed

Ensure ALL HHSI pumps in AUTO

Should also block COMS when > 350 ˚F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

What important pump / valve manipulations are performed PRIOR to entering MODE 4?

A

Containment Spray Pumps to AUTO

Open HHSI Cold Leg Injection Valves

Ensure 2 Trains of LHSI OPERABLE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

What important pump / valve manipulations are performed within 4 hrs of entering MODE 4 or any cold leg temperature exceeding 225 ˚F?

A
  • *1 HHSI in AUTO**
  • Must start HHSI to verify it works*

1 HHSI racked out but NOT tagged

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

When exiting MODE 6, when is MODE 5 entered?

A

Rx Vessel Head completely tensioned

All adjustment passes made.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  • 0POP03-ZG-0001 Plant Heatup*
    • *

At what RCS temperature must CCW be in operation to cool the operable RHR seal coolers?

A

≥ 120 ˚F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly