If the fuel is conditioned, how quickly can the operators raise power from 0% -100%?
- Should:*
- *≤ 10%/hr**
- Shall:*
- *≤ 12%/hr**
Conditioned fuel has ≥ 72 hrs in any 7 day period at > 95% RTP.

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
What must the margin to OT∆T be maintained at?
≥ 5% Margin

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
How many loop feedwater temperatures are required for calorimetric uncertainty?
3 Loops

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
How long should DA pressure be maintained > 35 psig prior to placing PV-7174/PV-7174A MS Supply Valves in the MOD position?
30 mins

Low pressure causes the controller to saturate causing PV‑7174 and PV‑7174A to open. A potentially severe hydraulic transient could occur.
- 0POP03-ZG-0005 Plant S/U to 100%*
- *
What are the open permissives for the FWIVs?
SGNR Level > 5%
SG Pressure > 685 psig
- FWIVs fail closed on loss of hydraulics/power. (Will not close on loss of N2 pressure)
- Hydraulic open / N2 closed
- FW Isolation Energizes Train A/B solenoids, which secure the hydraulic pumps and dump hydraulic fluid (Manual switches [2 / SG] located on CP006)
- Open permissives being met allows de-energizing Train A/B solenoids.
Note:
Same concept for FWIBs and Preheater Bypass Valves (PBVs) except solenoids de-energize to dump hydraulics and energize to allow opening.

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
What must be done if both fans on the Isophase are lost?
Reduce Power to 50%
Lower Isophase Current to 18,500 Amps
Lower load at 5%/min
Generator Current on CP007
Normal current rating is 36,600 Amps
Note:
Isophase trouble on CP010.

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
When should Feedwater be transferred from the LPFRVs to the MFRVs?
Prior to exceeding 75% on the LPFRVs

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
At what power levels are the Low Power FRVs and Main FRVs used?
- Low Power FRVs:*
- *< 15%**
- Fail closed on Loss of Air/Power*
- Main FRVs:*
- *≥ 15%**
- Fail closed on Loss of Air ONLY*
- Controlled from CP006
- *
Note:
2 safety related solenoids for FW Isolation signal

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
Describe how U1118 measures feedwater flow if LEFM system is lost?
Switches to Corrected Venturi Input
AND
Starts 72 hr timer
- *Switches to Venturi Input when 72 hr timer expires**
- *OR**
- *> 10% drop in Rx power**
- Limit Power to ≤ 99.6 RTP (3838 MWt)*
Correction Factors and Power level are captured when LEFM lost for Corrected Venturi Input.
Note:
Time Remaining changes from Cyan to Red when 6 hrs are remaining on clock.

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
What should gland steam pressure be maintained less than?
< 140 psig

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
If the fuel is unconditioned, how quickly can the operators raise power from 0% -100%?
0% - 50%:
Should: ≤ 10%/hr
Shall: ≤ 12%/hr
- 50% - 100%:*
- *≤ 3%/hr**
Hold Points:
- 75% - 78%: 3 hrs
- 95% - 98%: 10 hrs - previous hold points
Note:
To count as hold, must hold power ± 1% for ≥ 3 hrs

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
When should a second condensate and FW booster pump be placed in service?
Prior to exceeding 30% power

Can wait up to 40% power but that will result in a chemistry action level.
- 0POP03-ZG-0005 Plant S/U to 100%*
- *
How is the preferred PZR pressure channel determined?
Select LOWEST PZR Pressure Channel

Obtains the highest OT∆T setpoint margin for the remaining loops.
- 0POP03-ZG-0005 Plant S/U to 100%*
- *
When Rx Power is > 50% and the power ascension rate is > 1%/hr, what should control rod withdrawal rate be limited to?
3 steps/hr
May exceed limit to limit AFD but cannot exceed 6 steps/hr
- 50% - 75%: AFD ± 5% of target value
- 75% - 100%: AFD ± 3% of target value

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
What are the restrictions for raising a SGFPT’s speed > 5400 RPM?
- 5400 - 5500 RPM:*
- *May be operated in this range indefinitely**
Each SGFPT’s flowrate > 8250 gpm
- 5500 - 5600 RPM:*
- *Operated in this range ≤ 1 hr**
Each SGFPT’s flowrate > 11000 gpm

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
What will auto open the exhaust hood spray valves?
Crossover Steam Pressure < 15%
AND
Turbine Speed > 600 RPM
- Maintains spray pressure 116 psig (40 gpm)
- Alarm set at 175 ˚F
Note:
Controlled on CP007

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
At what point in the Plant startup can the main generator be synced to the grid?
Rx Power ≥ 12%
AND
Steam Dump Dump Demand ≥ 13%

- 0POP03-ZG-0005 Plant S/U to 100%*
- *
At what point during plant startup do we roll the main turbine?
Steam Dump Demand > 3%
Rx Power Stable or Rising
Establishes sufficient steam flow to allow rolling the turbine without primary/secondary plant perturbations.