0POP03-ZG-0006 Plant S/D 100% to MODE 3 Flashcards

1
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

What is runout speed for the condensate pump?

A

11,000 gpm

Condensate flow is ≈ 7,500 gpm at 40% Rx Power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When must 2 CARS pumps be in operation?

A

Rx Power < 30%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When are expanded ranges NOT allowed to be used to meet values/ranges in this procedure?

A

Meeting Tech Specs

> 98% Rx Power

< 10% Rx Power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

Why does placing excess letdown in service make U1118 inaccurate?

A

Bypasses Instrumentation

U1118 becomes inaccurate in the non-conservative direction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When should Rx Engineering supply an axial flux control strategy?

A

RTP of < 85% for > 2 weeks anticipated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

What should RCS boron concentration be limited to?

A
  • < 1 hr after S/D:*
  • *2500 ppm**
  • > 1 hr after S/D:*
  • *3500 ppm**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

What is differential boron concentration limit between the RCS and PZR?

A

50 ppm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When below the POAH, how should the operator stop an uncontrolled cooldown?

A

Isolating secondary heat loads

Do NOT dilute or pull rods to stop the cooldown.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When should Polyacrylic Acid (PAA) dispersant injection be isolated?

A

Before Reducing Rx Power < 30%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When must rods be placed in manual?

A

Turbine load lowers to ≈ 208 MWe

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

How does the operator fully shut 1(2)-FW-MOV-0108 (FW Heater 11A/B bypass isolation MOV)?

A

Hold the jog switch in the closed direction until the torque limit switch turns off the motor.

Lights will show valve is shut when it is still 5% open.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

What is the Rx power limit for feeding the SGs through the main feed nozzle?

A

4%

Prevents thermal stratification when feedwater flows are less than 125,000 lbm/hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When is Tref and Program Tavg equal?

A

100% RTP

Program Tavg is linear when going from 0% to 100% and Tref is not.

  • Note:*
  • Rod motion can occur in as little as 0.3 ˚F temperature mismatch.*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When must Chemistry perform an isotopic analysis of the RCS for Iodine to satisfy Technical Specifications?

A

Change in RTP of > 15% in any 1 hr period.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

What must be performed if ≥ 2 rods do not insert on a Rx Trip?

A

Emergency Borate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When should the a condensate pump and a FW booster pump be secured?

A

≈ 40% Rx Power

17
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When should zinc injection be secured?

A
  • After Rx Trip:*
  • *As soon as practical**
  • Planned Rx Shutdown:*
  • *At least 1 day prior**

For a power reduction of > 72 hrs, may reduce zinc injection.

Note:
If CVCS demin taken offline for > 2 hrs or letdown flow is changed by > 20%, then zinc injection should be evaluated by chemistry.

18
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

What indication should be used to monitor Rx Power?

A
  • Steady State:*
  • *U1118**
  • Power Changes:*
  • *RCS Loop ∆T Power**
19
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

When should the LP Heater Drip Pumps and the MSR drip pumps be secured?

A

< ≈ 20% Rx Power

20
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

How long can the emergency lube oil pump be operated?

A

75 mins

Based on 250 VDC battery design capacity with no battery charger on service

21
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

How long can the main turbine be operated in the main turbine exhaust pressure restrictive zone?

A

5 Mins

OR

Trip Main Turbine AND Reactor

22
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

What are the important PZR Master pressure controller setpoints?

A
  • PCV-655A:*
  • *87.5% (2335 psig): Opens**
  • *75% (2312 psig): Closes**
  • Spray Valves:*
  • *72% (2310 psig): Full Open**
  • *40.5% (2260 psig): Start to Open**
  • Control Heaters:*
  • *34.5% (2250 psig): Zero Power**
  • 25% (2235 psig): NOP*
  • *15.5% (2220 psig): Full Power**
  • B/U Heaters:*
  • *14.5% (2218 psig): Turn Off**
  • *9.5% (2210 psig): Turn On**

Controller range is ≈ 2200 - 2350 psig.

23
Q
  • 0POP03-ZG-0006 Plant S/D 100% to MODE 3*
    • *

What should Main Generator cold gas temperature be maintained greater than when reducing generator load?

A

≥ 90 ˚F