WCS Flashcards
Which symbol following a periodicity code indicates procedure intended to be scheduled & performed by either Ship’s Force or Off-Ship Maintenance Personnel?
(++ signs)
Intentional placement of equipment/system in hibernated state for specific duration w/ intention of reactivating at end of duration is defined as?
Inactive Equipment
Technical PMS discrepancies that could have detrimental effect on safety are classified as what type of Technical Feedback Report?
Urgent
List 3 categories of periodicity:
Calendar
Non-calendar
Inactive Equipment Maintenance
What must happen when maintenance isn’t accomplished?
Check note entry annotated.
What provides detailed procedures & requirements for performing maintenance?
MRC
How many parts are in a Tag-out log?
6
Ship’s Force qualification in Tag-out user’s manual should be done by completion of what PQS?
3M 301 Personnel Qual Standard
MIPS/MRCs not scheduled that are required are called:
Omitted
What’s used to ensure all future requirements such as tools, parts, & test equipment are available for maintenance checks?
Forecasting Report
APL stands for
Allowance Parts List
Who’s responsible for adequacy & accuracy of tag-outs?
Ship’s Force
Identifying & correcting potential problems before equipment becomes inoperable is an objective of what program?
3M Planned Maintenance System
What control document provides sequential listing of all OOC & CAL instruments?
Instrument Log
How many spot checks should the LPO conduct weekly?
1 per work center
A paper printed TORS from ESOMS will be maintained for how long?
13 weeks
Purpose of maintenance requirement card?
Provide detailed procedures for performing maintenance requirements.
Purpose of Current Ships Maintenance Project (CSMP) ?
Provides shipboard maintenance managers w/ consolidated listing of deferred maintenance to identify material condition.
Who reviews & initials the line outs on Work Center LOEPs, MIPs, & R-Check reports?
LCPO
Who reviews schedules ensuring maintenance is level loaded & not scheduled to avoid assessments?
DIVO
Event based on current value of measurement in relation of value at the time of last accomplishment?
Metered Event
FBR stands for
Feed Back Report
If there’s no IEM maintenance provided, where do we request assistance from?
Type Commander (TYCOM)
Who reviews items “if applicable” or a note w/ steps to be omitted?
DLCPO
A list of warnings that go over possible hazards that may result in death or injury is
Safety precautions
Examples of IEM Periodicity Codes
PM
SU
OT
LU
Daily & situational checks not accomplished are
Lost
Who’s the 3M program technical expert?
3MC
What’s the instruction that dictates requirements for labeling HAZMAT?
OPNAVINST 5100.19
What 3 segment code’s used for cataloging MRCs?
SYSCOM MRC Control Number
3 types of spot checks
Historical
Equipment Verification Validation
Monitored Maintenance
Who’s the 3M system manager?
XO
RIN stands for
Record Identification Number