1
Q

Which symbol following a periodicity code indicates procedure intended to be scheduled & performed by either Ship’s Force or Off-Ship Maintenance Personnel?

A

(++ signs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Intentional placement of equipment/system in hibernated state for specific duration w/ intention of reactivating at end of duration is defined as?

A

Inactive Equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Technical PMS discrepancies that could have detrimental effect on safety are classified as what type of Technical Feedback Report?

A

Urgent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

List 3 categories of periodicity:

A

Calendar
Non-calendar
Inactive Equipment Maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What must happen when maintenance isn’t accomplished?

A

Check note entry annotated.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What provides detailed procedures & requirements for performing maintenance?

A

MRC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How many parts are in a Tag-out log?

A

6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Ship’s Force qualification in Tag-out user’s manual should be done by completion of what PQS?

A

3M 301 Personnel Qual Standard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

MIPS/MRCs not scheduled that are required are called:

A

Omitted

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What’s used to ensure all future requirements such as tools, parts, & test equipment are available for maintenance checks?

A

Forecasting Report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

APL stands for

A

Allowance Parts List

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Who’s responsible for adequacy & accuracy of tag-outs?

A

Ship’s Force

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Identifying & correcting potential problems before equipment becomes inoperable is an objective of what program?

A

3M Planned Maintenance System

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What control document provides sequential listing of all OOC & CAL instruments?

A

Instrument Log

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How many spot checks should the LPO conduct weekly?

A

1 per work center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

A paper printed TORS from ESOMS will be maintained for how long?

A

13 weeks

17
Q

Purpose of maintenance requirement card?

A

Provide detailed procedures for performing maintenance requirements.

18
Q

Purpose of Current Ships Maintenance Project (CSMP) ?

A

Provides shipboard maintenance managers w/ consolidated listing of deferred maintenance to identify material condition.

19
Q

Who reviews & initials the line outs on Work Center LOEPs, MIPs, & R-Check reports?

A

LCPO

20
Q

Who reviews schedules ensuring maintenance is level loaded & not scheduled to avoid assessments?

A

DIVO

21
Q

Event based on current value of measurement in relation of value at the time of last accomplishment?

A

Metered Event

22
Q

FBR stands for

A

Feed Back Report

23
Q

If there’s no IEM maintenance provided, where do we request assistance from?

A

Type Commander (TYCOM)

24
Q

Who reviews items “if applicable” or a note w/ steps to be omitted?

A

DLCPO

25
Q

A list of warnings that go over possible hazards that may result in death or injury is

A

Safety precautions

26
Q

Examples of IEM Periodicity Codes

A

PM
SU
OT
LU

27
Q

Daily & situational checks not accomplished are

A

Lost

28
Q

Who’s the 3M program technical expert?

A

3MC

29
Q

What’s the instruction that dictates requirements for labeling HAZMAT?

A

OPNAVINST 5100.19

30
Q

What 3 segment code’s used for cataloging MRCs?

A

SYSCOM MRC Control Number

31
Q

3 types of spot checks

A

Historical
Equipment Verification Validation
Monitored Maintenance

32
Q

Who’s the 3M system manager?

A

XO

33
Q

RIN stands for

A

Record Identification Number