Vol 1 - R&O Flashcards

1
Q

Which support agreement will be used to document issues of general understanding between two or more parties that do not involve reimbursement?

A

MOU

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

SABER task orders are priced based on a UPG, therefore, the Government may realize substantial cost savings by reserving smaller projects for SABER. However, ______ are ideal for larger projects.

A

MACCs (Multiple Award Construction Contracts)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which type of contract provides for filling all actual purchase requirements of designated Government activities for supplies or services during a specified contract period?

A

Requirements Contracts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The ______ is the process for determining exacting details and required actions for a work requirement determination.

A

WRWG (Work Request Working Group)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

From the following choices, which is NOT a Facility Manager responsibility?

A

Coordinate major repairs between the shops.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What should CEOER do when an existing asset is changed out or decommissioned?

A

Retire the existing BE Asset Record and remove it from the respective Job Plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which of the following is the minimum essential information that shall be included in the DD Form 1144 or MOA?

A

Description of the material or services required and delivery requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The ______ ensures the bills for reimbursable support are sent through DFAS and FM on a monthly or quarterly basis and follow up on unpaid collections.

A

Resource Advisor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Construction opportunities over $1,000,000 are programmed as Military Construction (MILCON), which requires ______,

A

Significantly more programming and eventual approval from Congress.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

For statutory approval above the installation level, all approval package information should be uploaded to NexGen into the Notes and Documents tab of the opportunity so it can be associated with the ______.

A

DD Form 1391.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Who validates the request and determines if the level of effort requires external contracting or in-house labor?

A

WRRB (Work Request Review Board).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Who will be contacted if a facility is found to be unsecured after hours by security forces?

A

Facility Manager.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

A host may require that a ______ obtains support from the host as a condition of being located on the installation, provided the host is capable of providing the quality and level of support required.

A

Tenant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

During the creation/review/modification of a BE asset record, it is imperative to maintain a/an ______ across the entire organization’s portfolio.

A

Standard naming convention.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which type of contract provides for an indefinite quantity, within stated limits, of supplies or services during a fixed period?

A

Indefinite Quantity Contracts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

______ are commercial pricing tools such as computer cost databases and libraries of hard copy books.

A

Unit Price Guides (UPG)

17
Q

______ contracts provide a streamlined means to complete minor construction projects estimated at less than $1M.

A

SABER (Simplified Acquisition Base Engineer)

18
Q

Which type of contract provides for delivery of definite quantity of specific supplies or services for a fixed period, with deliveries or performance to be scheduled at designated locations upon order?

A

Definite Quantity Contracts

19
Q

If submission timing for SITREPs are not directed by higher headquarters, reports are submitted ______ for the duration of the activity or operation.

A

Daily

20
Q

MACCs are ______ contracts whose requirements are competed among a pool of multiple awardees based on work defined in individual task orders.

A

Indefinite Delivery-Indefinite quantity

21
Q

Why would a Facility Managers SAAR account become suspended?

A

if the appointee misses the scheduled training

22
Q

Why would you send a service request back to a Facility Manager?

A

not enough information was provided

23
Q

Who provides an updated Facility Manager list with home or cell phone numbers monthly to the Fire Emergency Services Flight?

A

R&O Section

24
Q

Which Facility Manager Training developed locally and provided within the first 30 days of appointment, but no later than the 45-day point?

A

Formal Training

25
Q

For multiple BE asset records to be included in the same Job Plan’s asset record sub-tab they all must have which of the following?

A

Have the same PM Procedure requirements and have the same PM Frequency requirements.

26
Q

Which type of SITREP reports factors affecting readiness of forces or units, mobilization status, and daily battle casualties?

A

Personnel

27
Q

The WRWG will control the flow of actionable work to in-house shops so that work can be scheduled to begin within a 12-month period and be accomplished within ______ of the scheduled start date, regardless of scope.

A

12 months

28
Q

When Facility Managers are at the formal training many topics are covered. Which topic discusses Report of Survey (RoS)?

A

Facility abuse and reimbursement policy

29
Q

Which support agreement category would you use to document support between your Air Force squadron and an Army battalion?

A

Inter-service support agreements

30
Q

Which MWR category does community support programs belong to?

A

Category-B

31
Q

Facility Managers should establish a Key Control log on ______ or a locally developed spreadsheet.

A

AF Form 2427 Lock and Key Control Register

32
Q

When an asset is installed, changed out, or decommissioned, what happens to the records and why?

A

PM Job Plans and associated PM Schedules are updated to ensure the asset is serviced appropriately.