UTB14 Utilities Equipment and Maintenance Flashcards
What is the first thing you should do before installing an industrial food grinder?
Read the entire installation manual.
What is the function of the impeller in a food grinder?
Pulverize the garbage
What diameter waste pipe is needed when installing an industrial sink?
2-inch
What is the proper procedure for dislodging something stuck in the impeller?
Use a broom stick
What are steam kettles commonly called?
Coppers
What is the temperature tolerance of a steam table thermostat?
± 5° F
How do you ensure the safe and efficient operation of a range?
Observe a PM schedule.
How often should preventative maintenance be performed on the M-59 Field Range?
250 hours
What is the maximum time interval allowed before pumping out a grease trap?
3 months
What standard is used for all work concerning emergency eye/face wash equipment?
ANSI Z358.1
What is sufficient water flow in gallons per minute from a fire hydrant for firefighting?
250 GPM
Why are dry hydrants preferable over wet hydrants in cold weather?
They will not freeze
Why is a breakaway flange used in the construction of a fire hydrant?
To fracture should large stresses be applied to the hydrant
(True or False) A traffic model fire hydrant is used near traffic because it is smaller than a standard fire hydrant.
Flase
In which manual are the criteria for fire hydrant locations found?
MIL-HDBK-1008