Unit 3 Flashcards

1
Q

What is the desired outcome for the installation of rail brackets?

A

Center point of guide rails, plumb, squared, & firmly fastened

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Why is a rail installation plan required?

A

So fish plates don’t interfere

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What must be tested daily on a false car?

A

Safeties

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What would be considered an advantage of using a false car versus a running platform?

A

Doesn’t require completed hoistway, permanent machine, or car assembly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What must be adjusted/maintained with a running platform as car weights are increased?

A

Counterbalance ratio

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many floors of overlap should be incorporated when aligning rails in the “groups/jump” method instead of dropping plumb lines the entire hoistway?

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is a rail guage used for?

A

To set the DBG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the first components installed after the hoistway has been measured and it is determined that the elevator will fit properly?

A

Rail brackets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How is “kicking” a rail accomplished?

A

Shim one side of the bracket and rail

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How is “tipping” a rail accomplished?

A

Packing shims at fish plate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly