Unit 1 Flashcards
Who is responsible for initially installing hoist-way barricades?
General contractor
How often must waste material and debris be removed from the work site?
Everyday
What is one of the first things an elevator mechanic should do upon arriving at a new construction site?
Communicate with GC
What should the mechanic do after the material is properly stored but before the installation is started?
Verify the final layout with GC
Who is responsible for proper lighting in all work areas and stairways?
GC
What material is permitted in elevator hoist ways, machinery spaces, machine rooms, control spaces, and control rooms when surveying job with general contractor, as per ASME A.17.1/CSA B44 code?
Only machinery & equipment used directly in connection with elevator installation
Where is the best location to store the rails on a construction site prior construction to them being installed?
As close to the hoist way as possible
What may general contractors require all trades to complete before any work commences?
General or site specific safety meeting
What section of the Canadian electrical code covers wiring on elevators, dumbwaiters, escalators and moving walks?
Section 38
What conditions should a proper storage area on a construction site include?
Secure, safe & dry