- The “hot water heating boiler burner control uses” the _____ as the sensed variable.
A. Boiler water temperature B. Boiler water pressure C. Feedwater pressure D. Drum water level E. Boiler steam temperature
A. Boiler water “temperature”
- When the pressure inside the “Bourdon tube increases” the tube will tend to:
A. Become more oval showing higher pressure B. Straighten showing lower pressure C. Curve more showing higher pressure D. Curve more showing lower pressure E. Straighten showing higher pressure
E. Straighten showing higher pressure
3.During boiler operation if the combustion air pressure drops to low the _____ switch will de-energize the fuel valve.
A. Low gas pressure B. High gas pressure C. Low water level D. Low air pressure E. High limit
D. Low air pressure
- What is the device used to determine that the fan motor is working:
A. Motor contactor B. Air flow switch C. Power amperage draw meter D. Indicator light E. Flame scanner
B. Air flow switch
Note: determine fan so AIR FLOW
- All fittings ‘‘not properly or clearly identified’’:
A. May be used for low pressure service B. Can be used in water applications C. Can be used for compressed air service D. Should be kept for emergency use E. Should be rejected
E. Should be rejected
All fittings ‘‘not properly or clearly identified’’:
- Pressure gauges may loose their accuracy due to:
A. Wear and tear B. Metal fatigue C. Excessive vibration D. Steam entering the Bourdon tube E. All of the above
E. All of the above
7.Boiler gauge glass packing nuts “may be tightened”:
A. At any time B. Once the pressure has been removed C. Once the glass has cooled to room temperature D. With a torque wrench E. Only hand tight
B. Once the ‘‘pressure has been removed’’
- Possible causes of low water level include:
- Leaks caused by breakage or corrosion
- Excessive blowdown
- Automatic feedwater valve passing
- Boiler feed pump failure
- Excessive make-up
A. 1, 2, 3 B. 2, 3, 4 C. 3, 4, 5 D. 1, 2, 4 E. 2, 3, 5
D. 1, 2, 4
leaks,blowdown,pump failure
- The safety valve pop test can be carried out by:
A. Lifting the try lever B. Reducing the pressure on the spring C. Slowly raising the boiler pressure D. Popping the valve with a hammer E. Lowering the try lever
C. Slowly raising the boiler pressure
- A safety valve must be mounted:
- In the horizontal position
- To the boiler by a short nipple
- At the highest practicable part of the boiler
- With discharge water properly drained
- With a valve next to the boiler
A. 1, 2, 3 B. 2, 3, 4 C. 3, 4, 5 D. 1, 3, 5 E. 2, 4, 5
B. 2, 3, 4
- To the boiler by a short nipple
- At the highest practicable part of the boiler
- With discharge water properly drained
- '’Try cocks’’ are used on boilers to:
A. Test for steam pressure B. Prove the temperature of the steam C. Test the operation of the safety valve D. Drain water from the water column E. Check the boiler water level
E. Check the boiler water level
“TRY COCKS”
- A pressure gauge can most accurately be calibrated by using:
A. The Inspector’s test gauge B. A dead weight tester C. A test gauge comparator D. Hydraulic comparator E. Another pressure gauge
B. A dead weight tester
‘‘Used in Calibrating Pressure Gauge’’
- The low water fuel cut-off float is commonly used to operate both the Low water fuel cut-off switch and the:
A. High steam pressure switch B. Low fuel gas pressure switch C. Feedwater control switch D. Low steam pressure alarm E. Low feedwater temperature alarm
C. Feedwater control switch
- The high limit control of a steam heating boiler should operate at the:
A. Cut-out pressure of the operating control
B. Maximum allowable working pressure
C. Between the set pressures of the operating control and safety valve
D. Set pressure of the safety valve
E. Blowdown pressure of the safety valve
C. Between the ‘‘set pressures’’ of the operating control and ‘‘safety valve’’
- The minimum size of the hot water heating boiler bottom blow off or drain connection shall be:
A. 6 mm (¼ in.) B. 15 mm (½ in.) C. 19 mm (¾ in.) D. 25 mm (1 in.) E. 75 mm (3 in.)