Training Bulletin 130- New Ladder Pipe Assembly Flashcards
1
Q
LAFD Ladder Pipe Components: (5)
A
Ladder pipe Assembly with 2½” In Line Shut-Off
4” Gate Valve Shut-Off (AKA cluster)
2½” Stream Straightener
Smooth Bore Nozzles (1½”, 1¾” and 2”)
Akron Turbo Master Spray Nozzle (350 to 1000 GPM) (assigned to random apparatus)